Skip to main content

TestCase settings

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.6.0+

Overview​

We have provided slots for "Configuration" - "TestCase settings" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:settings:testcase:new​

Module path: Configuration / TestCase settings / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:settings:testcase:base​

Module path: Configuration / TestCase settings / Basic configuration

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:testcase:case​

Module path: Configuration / TestCase settings / Test case

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:testcase:plan​

Module path: Configuration / TestCase settings / Test plan

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:testcase:report​

Module path: Configuration / TestCase settings / Test report

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-settings-testcase-base-VXjH
title: Basic configuration
moduleType: ones:settings:testcase:base
modules:
- id: ones-settings-testcase-base-WXHp
title: Link project
entry: >-
modules/ones-settings-testcase-base-VXjH/ones-settings-testcase-base-WXHp/index.html

Supported config options: