Skip to main content

Default group

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.6.0+

Overview​

We have provided slots for "Configuration" - "Team settings" - "Default group" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:settings:team:default:new​

ONES Requirement: v3.11.15+

Module path: Configuration / Team settings / Default group / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:settings:team:default:info​

ONES Requirement: v3.11.15+

Module path: Configuration / Team settings / Default group / Team info

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:team:default:permission​

ONES Requirement: v3.11.15+

Module path: Configuration / Team settings / Default group / Team permission

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-settings-team-default-info-tDtA
title: Team info
moduleType: ones:settings:team:default:info
entry: modules/ones-settings-team-default-info-tDtA/index.html

Supported config options: