Skip to main content

System security

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.6.0+

Overview​

We have provided slots for "Configuration" - "System security" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:settings:safe:new​

Module path: Configuration / System security / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:settings:safe:default​

Module path: Configuration / System security / Default group

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-settings-safe-default-48rW
title: System security
moduleType: ones:settings:safe:default
modules:
- id: ones-settings-safe-default-CaHY
title: Audit Log
entry: >-
modules/ones-settings-safe-default-48rW/ones-settings-safe-default-CaHY/index.html

Supported config options: