Skip to main content

ONES Pipeline

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.6.0+

Overview​

We have provided slots for "ONES Pipeline" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:pipeline:new​

Module path: ONES Pipeline / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:pipeline:index​

Module path: ONES Pipeline / Pipeline

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-pipeline-index-CF4J
title: Pipeline
moduleType: ones:pipeline:index
entry: modules/ones-pipeline-index-CF4J/index.html

Supported config options: