Skip to main content

Pipeline Integration settings

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.6.0+

Overview​

We have provided slots for "Configuration" - "Pipeline Integration settings" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:settings:pipeline_integration:new​

ONES Requirement: v3.14.0+

Module path: Configuration / Pipeline Integration settings / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:settings:pipeline_integration:default​

ONES Requirement: v3.14.0+

Module path: Configuration / Pipeline Integration settings / Default group

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:pipeline:new (deprecated)​

Module path: Configuration / Pipeline settings / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:settings:pipeline:default (deprecated)​

Module path: Configuration / Pipeline settings / Default group

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-settings-pipeline_integration-default-kkuk
title: Pipeline settings
moduleType: ones:settings:pipeline_integration:default
modules:
- id: ones-settings-pipeline_integration-default-HMrW
title: Link Jenkins
entry: >-
modules/ones-settings-pipeline_integration-default-kkuk/ones-settings-pipeline_integration-default-HMrW/index.html

Supported config options: