Skip to main content

Automation settings

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.6.0+

Overview​

We have provided slots for "Configuration" - "Automation settings" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:settings:automation:new​

Module path: Configuration / Automation settings / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:settings:automation:default​

Module path: Configuration / Automation settings / Default group

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-settings-automation-default-IPUG
title: Automation settings
moduleType: ones:settings:automation:default
modules:
- id: ones-settings-automation-default-0yBY
title: Automation rule
entry: >-
modules/ones-settings-automation-default-IPUG/ones-settings-automation-default-0yBY/index.html

Supported config options: