Skip to main content

Basic configuration

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.6.0+

Overview​

We have provided slots for "Configuration" - "TestCase settings" - "Basic configuration" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:settings:testcase:base:new​

ONES Requirement: v3.11.15+

Module path: Configuration / TestCase settings / Basic configuration / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:settings:testcase:base:project​

Module path: Configuration / TestCase settings / Basic configuration / Link project

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:testcase:base:permission​

Module path: Configuration / TestCase settings / Basic configuration / Permission

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-settings-testcase-base-project-ugP9
title: Link project
moduleType: ones:settings:testcase:base:project
entry: modules/ones-settings-testcase-base-project-ugP9/index.html

Supported config options: