Skip to main content

ONES Wiki

Requirements​

ONES
v3.6.0+

Overview​

We have provided slots for "ONES Wiki" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:wiki:new​

Module path: ONES Wiki / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:wiki:group​

ONES Requirement: v3.11.15+

Module path: ONES Wiki / Spaces

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:wiki:share​

Module path: ONES Wiki / Shared with me

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-wiki-group-YjhC
title: Spaces
moduleType: ones:wiki:group
entry: modules/ones-wiki-group-YjhC/index.html

Supported config options: