Skip to main content

Sidebar menu

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.6.0+

Overview​

Sidebar menu slot is a set of slots corresponding to product lines one by one.

The slots currently supported are as follows:

Slots​

ones:workspace​

Module path: My work

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:testcase​

Module path: ONES TestCase

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:product​

Module path: Product Management

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:desk​

Module path: ONES Desk

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:deskhome​

Module path: ONES DeskHome

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

This slot only can be accessed by the URL described below:

${location.protocol}://${location.host}/project/#/desk_home

ones:manhour​

Module path: Worklog Management

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:performance​

Module path: ONES Performance

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:plan​

Module path: ONES Plan

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:pipeline​

Module path: ONES Pipeline

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:version​

Module path: Version Management

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:app:new​

Module path: ONES sidebar menu

Number limit: Declare a maximum of 1 slots in each plugin.

tip
  • The name of the slot can be configured through the title attribute of modules in plugin.yaml

  • The slot needs to be used with capabilities. For details, see: Sidebar Menu

  • If you want to replace the whole right zone including the topbar zone, the plugin.yaml should be configured as follows:

    modules:
    - id: ones-workspace-9rMc
    title: My work
    moduleType: ones:app:new
    entry: modules/ones-workspace-9rMc/index.html

    This has been supported since ONES v3.16.8+.

Usage​

modules:
- id: ones-workspace-9rMc
title: My work
moduleType: ones:workspace
modules:
- id: ones-workspace-A0r3
title: Overview
entry: modules/ones-workspace-9rMc/ones-workspace-A0r3/index.html

Supported config options:

caution

The title config cannot rename the name of the system sidebar menu, which should be configured in the page "Configuration" - "System preference settings" - "Sidebar menu".