Skip to main content

System preference settings

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.6.0+

Overview​

We have provided slots for "Configuration" - "System preference settings" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:settings:appearance:new​

Module path: Configuration / System preference settings / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:settings:appearance:default​

Module path: Configuration / System preference settings / Default group

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-settings-appearance-default-TxZS
title: System preference
moduleType: ones:settings:appearance:default
modules:
- id: ones-settings-appearance-default-cq77
title: Sidebar color
entry: >-
modules/ones-settings-appearance-default-TxZS/ones-settings-appearance-default-cq77/index.html

Supported config options: