Skip to main content

ONES TestCase

Requirements​

ONES
v3.6.0+

Overview​

We have provided slots for "ONES TestCase" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:testcase:new​

Module path: ONES TestCase / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:testcase:overview​

ONES Requirement: v3.11.15+

Module path: ONES TestCase / Overview

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:testcase:library​

Module path: ONES TestCase / Test case library

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:testcase:plan​

Module path: ONES TestCase / Test plans

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:testcase:report​

Module path: ONES TestCase / Test reports

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-testcase-overview-rsuI
title: Overview
moduleType: ones:testcase:overview
entry: modules/ones-testcase-overview-rsuI/index.html

Supported config options: