TestCase settings
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "Configuration" - "TestCase settings" to customize the page module for the application.
The slots currently supported are as follows:
- ones:settings:testcase:new
- ones:settings:testcase:base
- ones:settings:testcase:case
- ones:settings:testcase:plan
- ones:settings:testcase:report
Slots
ones:settings:testcase:new
Module path: Configuration / TestCase settings / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:settings:testcase:base
Module path: Configuration / TestCase settings / Basic configuration
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:testcase:case
Module path: Configuration / TestCase settings / Test case
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:testcase:plan
Module path: Configuration / TestCase settings / Test plan
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:testcase:report
Module path: Configuration / TestCase settings / Test report
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-settings-testcase-base-VXjH
title: Basic configuration
moduleType: ones:settings:testcase:base
modules:
- id: ones-settings-testcase-base-WXHp
title: Link project
entry: >-
modules/ones-settings-testcase-base-VXjH/ones-settings-testcase-base-WXHp/index.html
Supported config options: