Skip to main content

Default group

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.11.15+

Overview​

We have provided slots for "Configuration" - "System preference settings" - "Default group" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:settings:appearance:default:new​

Module path: Configuration / System preference settings / Default group / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:settings:appearance:default:sidebar​

Module path: Configuration / System preference settings / Default group / Sidebar color

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:appearance:default:menu​

Module path: Configuration / System preference settings / Default group / Sidebar menu

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:appearance:default:favicon​

Module path: Configuration / System preference settings / Default group / Browser favicon

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:appearance:default:workday​

Module path: Configuration / System preference settings / Default group / Workday settings

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:appearance:default:email​

Module path: Configuration / System preference settings / Default group / Email settings

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:appearance:default:message​

Module path: Configuration / System preference settings / Default group / Mobile number and SMS settings

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-settings-appearance-default-sidebar-NEnD
title: Sidebar color
moduleType: ones:settings:appearance:default:sidebar
entry: modules/ones-settings-appearance-default-sidebar-NEnD/index.html

Supported config options: