Skip to main content

Default group

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.11.15+

Overview​

We have provided slots for "Configuration" - "System security" - "Default group" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:settings:safe:default:new​

Module path: Configuration / System security / Default group / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:settings:safe:default:log​

Module path: Configuration / System security / Default group / Audit Log

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:safe:default:policy​

Module path: Configuration / System security / Default group / Network access security policy

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:safe:default:watermark​

Module path: Configuration / System security / Default group / Watermark

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-settings-safe-default-log-U7j_
title: Audit Log
moduleType: ones:settings:safe:default:log
entry: modules/ones-settings-safe-default-log-U7j_/index.html

Supported config options: