System security
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "Configuration" - "System security" to customize the page module for the application.
The slots currently supported are as follows:
Slots
ones:settings:safe:new
Module path: Configuration / System security / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:settings:safe:default
Module path: Configuration / System security / Default group
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-settings-safe-default-48rW
title: System security
moduleType: ones:settings:safe:default
modules:
- id: ones-settings-safe-default-CaHY
title: Audit Log
entry: >-
modules/ones-settings-safe-default-48rW/ones-settings-safe-default-CaHY/index.html
Supported config options: