Skip to main content

Link repositories

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.13.9+

Overview​

We have provided slots for "Configuration" - "Code Integration settings" - "Link repositories" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:settings:pipeline:default:repo:link​

Module path: Configuration / Code Integration settings / Link repositories / Link Repository / select repository / Open the plugin modal by clicking the next button

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

caution

This slot need the ability integration code repository.

Usage​

modules:
- id: ones-settings-pipeline-default-repo-link-JnJi
title: GitHub
moduleType: ones:settings:pipeline:default:repo:link
preload: true
manual: true
entry: modules/ones-settings-pipeline-default-repo-link-JnJi/index.html

Supported config options:

Available Hook API​

import { useCodeRepositoryInfo } from '@ones-op/store'

const codeRepositoryInfo = useCodeRepositoryInfo()

Third-party authentication​

If the third-party authentication needs to jump to the third-party page, you can create a new Redirect URI page by using the slot about-blank. After the authentication is finished and succeed, it will jump to the Redirect URI page with the authentication token, you can save it to the localStorage. In the slot ones:settings:pipeline:default:repo:link, you can listen the data change in the localStorage, and do more things with the token.

// about-blank
localStorage.setItem('your unique storage key', code)
// ones:settings:pipeline:default:repo:link
const codeRepoInfo = useCodeRepositoryInfo()

useEffect(() => {
if (!codeRepoInfo?.uuid) {
return () => {}
}
const listener = (event: StorageEvent) => {
if (event.key !== 'your unique storage key') {
return
}
const token = event.newValue
// TODO: save the token with the code repo uuid.
}

window.addEventListener('storage', listener)
return () => {
window.removeEventListener('storage', listener)
}
}, [codeRepoInfo])