Skip to main content

Default group

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.14.0+

Overview​

We have provided slots for "Configuration" - "Code Integration settings" - "Default group" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:settings:code_integration:default:new​

Module path: Configuration / Code Integration settings / Default group / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:settings:code_integration:default:repo​

Module path: Configuration / Code Integration settings / Default group / Link repositories

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:pipeline:default:repo (deprecated)​

ONES Requirement: v3.11.15+

Module path: Configuration / Pipeline settings / Default group / Manage repositories

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-settings-code_integration-default-repo-YA0a
title: Link repositories
moduleType: ones:settings:code_integration:default:repo
entry: modules/ones-settings-code_integration-default-repo-YA0a/index.html

Supported config options: