Link repositories
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.13.9+ |
Overview
We have provided slots for "Configuration" - "Code Integration settings" - "Link repositories" to customize the page module for the application.
The slots currently supported are as follows:
Slots
ones:settings:pipeline:default:repo:link
Module path: Configuration / Code Integration settings / Link repositories / Link Repository / select repository / Open the plugin modal by clicking the next button
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
This slot need the ability integration code repository.
Usage
modules:
- id: ones-settings-pipeline-default-repo-link-JnJi
title: GitHub
moduleType: ones:settings:pipeline:default:repo:link
preload: true
manual: true
entry: modules/ones-settings-pipeline-default-repo-link-JnJi/index.html
Supported config options:
-
This option must be set to
true. -
This option is recommended to be set to
true.
Available Hook API
import { useCodeRepositoryInfo } from '@ones-op/store'
const codeRepositoryInfo = useCodeRepositoryInfo()
Third-party authentication
If the third-party authentication needs to jump to the third-party page, you can create a new Redirect URI page by using
the slot about-blank. After the authentication is finished and succeed, it will jump to the
Redirect URI page with the authentication token, you can save it to the localStorage. In the slot ones:settings:pipeline:default:repo:link,
you can listen the data change in the localStorage, and
do more things with the token.
// about-blank
localStorage.setItem('your unique storage key', code)
// ones:settings:pipeline:default:repo:link
const codeRepoInfo = useCodeRepositoryInfo()
useEffect(() => {
if (!codeRepoInfo?.uuid) {
return () => {}
}
const listener = (event: StorageEvent) => {
if (event.key !== 'your unique storage key') {
return
}
const token = event.newValue
// TODO: save the token with the code repo uuid.
}
window.addEventListener('storage', listener)
return () => {
window.removeEventListener('storage', listener)
}
}, [codeRepoInfo])