Skip to main content

Default group

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.11.15+

Overview​

We have provided slots for "Configuration" - "Worklog settings" - "Default group" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:settings:manhour:default:new​

Module path: Configuration / Worklog settings / Default group / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:settings:manhour:default:mode​

Module path: Configuration / Worklog settings / Default group / Worklog mode

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:manhour:default:limit​

Module path: Configuration / Worklog settings / Default group / Time spent limit

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-settings-manhour-default-mode-h778
title: Worklog mode
moduleType: ones:settings:manhour:default:mode
entry: modules/ones-settings-manhour-default-mode-h778/index.html

Supported config options: