Default group
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.11.15+ |
Overview
We have provided slots for "Configuration" - "Worklog settings" - "Default group" to customize the page module for the application.
The slots currently supported are as follows:
- ones:settings:manhour:default:new
- ones:settings:manhour:default:mode
- ones:settings:manhour:default:limit
Slots
ones:settings:manhour:default:new
Module path: Configuration / Worklog settings / Default group / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:settings:manhour:default:mode
Module path: Configuration / Worklog settings / Default group / Worklog mode
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:manhour:default:limit
Module path: Configuration / Worklog settings / Default group / Time spent limit
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-settings-manhour-default-mode-h778
title: Worklog mode
moduleType: ones:settings:manhour:default:mode
entry: modules/ones-settings-manhour-default-mode-h778/index.html
Supported config options: