Worklog settings
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "Configuration" - "Worklog settings" to customize the page module for the application.
The slots currently supported are as follows:
Slots
ones:settings:manhour:new
Module path: Configuration / Worklog settings / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:settings:manhour:default
Module path: Configuration / Worklog settings / Default group
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-settings-manhour-default-95j9
title: Worklog settings
moduleType: ones:settings:manhour:default
modules:
- id: ones-settings-manhour-default-vRxk
title: Worklog mode
entry: >-
modules/ones-settings-manhour-default-95j9/ones-settings-manhour-default-vRxk/index.html
Supported config options: