Basic configuration
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "Configuration" - "TestCase settings" - "Basic configuration" to customize the page module for the application.
The slots currently supported are as follows:
- ones:settings:testcase:base:new
- ones:settings:testcase:base:project
- ones:settings:testcase:base:permission
Slots
ones:settings:testcase:base:new
ONES Requirement: v3.11.15+
Module path: Configuration / TestCase settings / Basic configuration / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:settings:testcase:base:project
Module path: Configuration / TestCase settings / Basic configuration / Link project
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:testcase:base:permission
Module path: Configuration / TestCase settings / Basic configuration / Permission
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-settings-testcase-base-project-ugP9
title: Link project
moduleType: ones:settings:testcase:base:project
entry: modules/ones-settings-testcase-base-project-ugP9/index.html
Supported config options: