Default group
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.11.15+ |
Overview
We have provided slots for "Configuration" - "System security" - "Default group" to customize the page module for the application.
The slots currently supported are as follows:
- ones:settings:safe:default:new
- ones:settings:safe:default:log
- ones:settings:safe:default:policy
- ones:settings:safe:default:watermark
Slots
ones:settings:safe:default:new
Module path: Configuration / System security / Default group / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:settings:safe:default:log
Module path: Configuration / System security / Default group / Audit Log
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:safe:default:policy
Module path: Configuration / System security / Default group / Network access security policy
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:safe:default:watermark
Module path: Configuration / System security / Default group / Watermark
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-settings-safe-default-log-U7j_
title: Audit Log
moduleType: ones:settings:safe:default:log
entry: modules/ones-settings-safe-default-log-U7j_/index.html
Supported config options: