Default group
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.11.15+ |
Overview
We have provided slots for "Configuration" - "System preference settings" - "Default group" to customize the page module for the application.
The slots currently supported are as follows:
- ones:settings:appearance:default:new
- ones:settings:appearance:default:sidebar
- ones:settings:appearance:default:menu
- ones:settings:appearance:default:favicon
- ones:settings:appearance:default:workday
- ones:settings:appearance:default:email
- ones:settings:appearance:default:message
Slots
ones:settings:appearance:default:new
Module path: Configuration / System preference settings / Default group / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:settings:appearance:default:sidebar
Module path: Configuration / System preference settings / Default group / Sidebar color
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:appearance:default:menu
Module path: Configuration / System preference settings / Default group / Sidebar menu
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:appearance:default:favicon
Module path: Configuration / System preference settings / Default group / Browser favicon
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:appearance:default:workday
Module path: Configuration / System preference settings / Default group / Workday settings
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:appearance:default:email
Module path: Configuration / System preference settings / Default group / Email settings
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:appearance:default:message
Module path: Configuration / System preference settings / Default group / Mobile number and SMS settings
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-settings-appearance-default-sidebar-NEnD
title: Sidebar color
moduleType: ones:settings:appearance:default:sidebar
entry: modules/ones-settings-appearance-default-sidebar-NEnD/index.html
Supported config options: