Skip to main content

Default group

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.11.15+

Overview​

We have provided slots for "Configuration" - "Pipeline Integration settings" - "Default group" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:settings:pipeline_integration:default:new​

ONES Requirement: v3.14.0+

Module path: Configuration / Pipeline Integration settings / Default group / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:settings:pipeline_integration:default:jenkins​

ONES Requirement: v3.14.0+

Module path: Configuration / Pipeline Integration settings / Default group / Link pipeline tools

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:pipeline:default:new (deprecated)​

Module path: Configuration / Pipeline settings / Default group / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:settings:pipeline:default:jenkins (deprecated)​

Module path: Configuration / Pipeline settings / Default group / Link Jenkins

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-settings-pipeline_integration-default-jenkins-YA0a
title: Link Jenkins
moduleType: ones:settings:pipeline_integration:default:jenkins
entry: modules/ones-settings-pipeline_integration-default-jenkins-YA0a/index.html

Supported config options: