Default group
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.11.15+ |
Overview
We have provided slots for "Configuration" - "Pipeline Integration settings" - "Default group" to customize the page module for the application.
The slots currently supported are as follows:
- ones:settings:pipeline_integration:default:new
- ones:settings:pipeline_integration:default:jenkins
- ones:settings:pipeline:default:new (deprecated)
- ones:settings:pipeline:default:jenkins (deprecated)
Slots
ones:settings:pipeline_integration:default:new
ONES Requirement: v3.14.0+
Module path: Configuration / Pipeline Integration settings / Default group / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:settings:pipeline_integration:default:jenkins
ONES Requirement: v3.14.0+
Module path: Configuration / Pipeline Integration settings / Default group / Link pipeline tools
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:pipeline:default:new (deprecated)
Module path: Configuration / Pipeline settings / Default group / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:settings:pipeline:default:jenkins (deprecated)
Module path: Configuration / Pipeline settings / Default group / Link Jenkins
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-settings-pipeline_integration-default-jenkins-YA0a
title: Link Jenkins
moduleType: ones:settings:pipeline_integration:default:jenkins
entry: modules/ones-settings-pipeline_integration-default-jenkins-YA0a/index.html
Supported config options: