Pipeline Integration settings
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "Configuration" - "Pipeline Integration settings" to customize the page module for the application.
The slots currently supported are as follows:
- ones:settings:pipeline_integration:new
- ones:settings:pipeline_integration:default
- ones:settings:pipeline:new (deprecated)
- ones:settings:pipeline:default (deprecated)
Slots
ones:settings:pipeline_integration:new
ONES Requirement: v3.14.0+
Module path: Configuration / Pipeline Integration settings / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:settings:pipeline_integration:default
ONES Requirement: v3.14.0+
Module path: Configuration / Pipeline Integration settings / Default group
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:pipeline:new (deprecated)
Module path: Configuration / Pipeline settings / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:settings:pipeline:default (deprecated)
Module path: Configuration / Pipeline settings / Default group
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-settings-pipeline_integration-default-kkuk
title: Pipeline settings
moduleType: ones:settings:pipeline_integration:default
modules:
- id: ones-settings-pipeline_integration-default-HMrW
title: Link Jenkins
entry: >-
modules/ones-settings-pipeline_integration-default-kkuk/ones-settings-pipeline_integration-default-HMrW/index.html
Supported config options: