Performance settings
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "Configuration" - "Performance settings" to customize the page module for the application.
The slots currently supported are as follows:
Slots
ones:settings:performance:new
Module path: Configuration / Performance settings / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:settings:performance:default
Module path: Configuration / Performance settings / Default group
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-settings-performance-default-xAF6
title: Performance settings
moduleType: ones:settings:performance:default
modules:
- id: ones-settings-performance-default-FeZK
title: Permission
entry: >-
modules/ones-settings-performance-default-xAF6/ones-settings-performance-default-FeZK/index.html
Supported config options: