Skip to main content

Default group

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.6.0+

Overview​

We have provided slots for "Configuration" - "Migrate data" - "Default group" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:settings:import:default:new​

Module path: Configuration / Migrate data / Default group / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:settings:import:default:jira​

Module path: Configuration / Migrate data / Default group / Migrate data from Jira

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-settings-import-default-jira-O18b
title: Import data from Jira
moduleType: ones:settings:import:default:jira
entry: modules/ones-settings-import-default-jira-O18b/index.html

Supported config options: