Code Integration settings
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.14.0+ |
Overview
We have provided slots for "Configuration" - "Code Integration settings" to customize the page module for the application.
The slots currently supported are as follows:
Slots
ones:settings:code_integration:new
Module path: Configuration / Code Integration settings / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:settings:code_integration:default
Module path: Configuration / Code Integration settings / Default group
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-settings-code_integration-default-kkuk
title: Code Integration settings
moduleType: ones:settings:code_integration:default
modules:
- id: ones-settings-code_integration-default-HMrW
title: Link repositories
entry: >-
modules/ones-settings-code_integration-default-kkuk/ones-settings-code_integration-default-HMrW/index.html
Supported config options: