Skip to main content

Default group

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.6.0+

Overview​

We have provided slots for "Configuration" - "User management" - "Default group" to customize the page module for the application.

The slots currently supported are as follows:

Slots​

ones:settings:account:default:new​

Module path: Configuration / User management / Default group / new module

Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.

ones:settings:account:default:member​

Module path: Configuration / User management / Default group / Member

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:account:default:group​

Module path: Configuration / User management / Default group / User group

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:account:default:login​

Module path: Configuration / User management / Default group / Login abd logout settings

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:account:default:connect​

Module path: Configuration / User management / Default group / Account integrations

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

ones:settings:account:default:safe​

Module path: Configuration / User management / Default group / Account security

Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.

Usage​

modules:
- id: ones-settings-account-default-member-6QCI
title: Member
moduleType: ones:settings:account:default:member
entry: modules/ones-settings-account-default-member-6QCI/index.html

Supported config options: