Automation settings
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "Configuration" - "Automation settings" to customize the page module for the application.
The slots currently supported are as follows:
Slots
ones:settings:automation:new
Module path: Configuration / Automation settings / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:settings:automation:default
Module path: Configuration / Automation settings / Default group
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-settings-automation-default-IPUG
title: Automation settings
moduleType: ones:settings:automation:default
modules:
- id: ones-settings-automation-default-0yBY
title: Automation rule
entry: >-
modules/ones-settings-automation-default-IPUG/ones-settings-automation-default-0yBY/index.html
Supported config options: