Wiki settings
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "Configuration" - "Wiki settings" to customize the page module for the application.
The slots currently supported are as follows:
Slots
ones:settings:wiki:new
Module path: Configuration / Wiki settings / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:settings:wiki:default
Module path: Configuration / Wiki settings / Default group
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-settings-wiki-default-u5bl
title: Wiki settings
moduleType: ones:settings:wiki:default
modules:
- id: ones-settings-wiki-default-ktWv
title: Space management
entry: >-
modules/ones-settings-wiki-default-u5bl/ones-settings-wiki-default-ktWv/index.html
Supported config options: