Product
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "Configuration" - "Project settings" - "Product" to customize the page module for the application.
The slots currently supported are as follows:
Slots
ones:settings:project:product:new
ONES Requirement: v3.11.15+
Module path: Configuration / Project settings / Product / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:settings:project:product:field
Module path: Configuration / Project settings / Product / Product field
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-settings-project-product-field-y02J
title: Product field
moduleType: ones:settings:project:product:field
entry: modules/ones-settings-project-product-field-y02J/index.html
Supported config options: