Issue
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "Configuration" - "Project settings" - "Issue" to customize the page module for the application.
The slots currently supported are as follows:
- ones:settings:project:issue:new
- ones:settings:project:issue:type
- ones:settings:project:issue:field
- ones:settings:project:issue:status
- ones:settings:project:issue:priority
- ones:settings:project:issue:relate
Slots
ones:settings:project:issue:new
ONES Requirement: v3.11.15+
Module path: Configuration / Project settings / Issue / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:settings:project:issue:type
Module path: Configuration / Project settings / Issue / Issue type
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:project:issue:field
Module path: Configuration / Project settings / Issue / Issue field
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:project:issue:status
Module path: Configuration / Project settings / Issue / Issue status
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:project:issue:priority
Module path: Configuration / Project settings / Issue / Priority
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:project:issue:relate
Module path: Configuration / Project settings / Issue / Link type
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-settings-project-issue-type-5PXx
title: Issue type
moduleType: ones:settings:project:issue:type
entry: modules/ones-settings-project-issue-type-5PXx/index.html
Supported config options: