Project settings
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.6.0+ |
Overview
We have provided slots for "Configuration" - "Project settings" to customize the page module for the application.
The slots currently supported are as follows:
- ones:settings:project:new
- ones:settings:project:self
- ones:settings:project:issue
- ones:settings:project:product
- ones:settings:project:config
- ones:settings:project:permission
Slots
ones:settings:project:new
Module path: Configuration / Project settings / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:settings:project:self
Module path: Configuration / Project settings / Project
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:project:issue
Module path: Configuration / Project settings / Issue
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:project:product
Module path: Configuration / Project settings / Product
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:project:config
Module path: Configuration / Project settings / Global configuration
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:project:permission
Module path: Configuration / Project settings / Permission
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-settings-project-self-KnvX
title: Project
moduleType: ones:settings:project:self
modules:
- id: ones-settings-project-self-MxpO
title: Project management
entry: >-
modules/ones-settings-project-self-KnvX/ones-settings-project-self-MxpO/index.html
Supported config options: