Default group
| Suitable Enviroment | SaaS |
| Private Deployment |
Requirements
| ONES |
|---|
| v3.11.15+ |
Overview
We have provided slots for "Configuration" - "Automation settings" - "Default group" to customize the page module for the application.
The slots currently supported are as follows:
- ones:settings:automation:default:new
- ones:settings:automation:default:rule
- ones:settings:automation:default:history
Slots
ones:settings:automation:default:new
Module path: Configuration / Automation settings / Default group / new module
Number limit: Declare a maximum of 10 slots in each plugin, and up to 100 slots in the system.
ones:settings:automation:default:rule
Module path: Configuration / Automation settings / Default group / Automation rule
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
ones:settings:automation:default:history
Module path: Configuration / Automation settings / Default group / Running history
Number limit: Declare a maximum of 1 slots in each plugin, and up to 1 slots in the system.
Usage
modules:
- id: ones-settings-automation-default-rule-JsqM
title: Automation rule
moduleType: ones:settings:automation:default:rule
entry: modules/ones-settings-automation-default-rule-JsqM/index.html
Supported config options: