Skip to main content

op.config.mjs

The CLI tool configuration file allows you to customize the behavior of certain commands in the OP-CLI and OPT-CLI by using various configuration options.

You need to export a configuration object in op.config.mjs:

op.config.mjs
/** @type { import("@ones/cli-utils").OpConfigSchema } */
export default {
onesVersion: '3.15.0',
scan: {
apis: ['project/api/version'],
},
}

The type definition for the configuration object is as follows:

interface OpConfigSchema {
onesVersion?: string
scan?: {
roots?: string[]
exclude?: Array<string | RegExp>
output?: {
level?: 'all' | 'matched'
}
patternFragment?: {
pre?: string
placeholder?: string
post?: string
}
checkIsPathLikeString?: (value: string) => boolean
apis?: string[]
}
}

onesVersion​

The target ONES system version used for checking unsupported slots and abilities during packaging and scanning.

info

The difference between this field and the service.min_system_version field in plugin.yaml is as follows:

  • The onesVersion field in op.config.mjs needs to be manually assigned by the developer, whereas the service.min_system_version field in plugin.yaml is automatically deduced based on the capabilities used within the plugin. Developers do not need to modify the value of this field.
  • After specifying the onesVersion in op.config.mjs, during the packaging of the OPK file, op-cli will validate whether the plugin uses deprecated capabilities before the target version and whether it uses capabilities that are only available after the target version. During plugin installation, the Open Platform will verify if the current ONES system version is greater than the service.min_system_version specified in the plugin's plugin.yaml file.

enableApiHijack​

Whether to allow plugins to declare API interfaces that hijack the ONES API. The default value is false.

scan​

Code scanning configuration used to customize the behavior of the op scan and opt check commands.

scan.roots​

The root directories to be scanned. The default value is ["web","backend"] and is only applicable to the op scan command.

scan.exclude​

Paths to be excluded from scanning. The default value is [/node_modules/, /dist/] and is only applicable to the op scan command.

scan.checkIsPathLikeString​

A function that determines whether a string literal is a URL. The default value is (value) => value.includes('/') && value !== '/' and is only applicable to the op scan command.

scan.output​

Configuration for scan result output. Only applicable to the op scan command.

scan.output.level​

Output level with the following options:

  • all: Only output scan results that match APIs.
  • matched: Output all scan results.

The default value is all.

scan.apis​

The collection of APIs to match. The default value is [].

scan.patternFragment​

Configuration for URL regular expression fragments used to customize the matching rules.

scan.patternFragment.pre​

The prefix regular expression fragment of the URL regular expression. The default value is "(?:[^\n]*)".

scan.patternFragment.placeholder​

The placeholder regular expression fragment of the URL regular expression. The default value is "(?:[^\n/]*)".

scan.patternFragment.post​

The postfix regular expression fragment of the URL regular expression. The default value is "(?:[^\n]*)".

build​

When packaging plugin resources, modify the function of the Webpack configuration. It accepts two parameters: the first parameter is the default Webpack configuration, and the second parameter is the packaging task information, such as whether the packaging target is for the web or the backend.

For example:

op.config.mjs
export default {
build: (config, task) => {
if (task.target === 'web') {
config.output.publicPath = 'https://cdn.example.com/'
}
},
}