Skip to main content

OP CLI Commands

This reference lists the commands that you can use to build plugin with OP CLI.

note

OP CLI is a dependency of the plugin project.

Please upgrade to the latest version of the OP CLI as much as possible to utilize the latest features and fixes we provide.

Developer need to use npx to execute command like: npx op [command] [arguments] [options]

Overview​

CommandDescription
initInitialize project settings.
addAdd a ability or module for the project.
packupPack up the plugin project and build .opk file in the root directory, provide version control
loginStore the parameters used to obtain user credentials in a specific environment into config/local.yaml.
pickteamFetch the team list and update the config file with the team information from the team list for local debugging or CI deployment.
invokeStart the plugin project locally and invoke one or several life-cycles of the plugin.
upgradeUpgrade @ones/cli-plugin and relative dependencies to lastest version which range of current major version.content.
scanScan the interface URLs used in the plugin project.

init​

Initialize project settings.

It will be automatic execute after install npm dependencies, developer can check scripts fields on packages.json to learn more detail.

npx op init

add​

Add a ability or module for the project.

npx op add <target-type>

Examples​

  1. Add module or sub-module for project
npx op add module
npx op add sub-module
  1. Add ability or sub-module for project
npx op add ability

Arguments​

ArgumentDescription
target-typeSpecify a content type that you want to add, support types:
  • module
  • sub-module
  • ability

packup​

Pack up the plugin project and build .opk file in the root directory, provide version control.

npx op packup [filename]

Arguments​

ArgumentDescription
filenameSpecify the name of the .opk file, default is the project name.

Options​

ArgumentRequirementsDescription
--bump <mode>@ones/cli-plugin v1.14.0+packup plug-in with bump options, no-modify: do not bump version, major: bump major version, minor: bump minor version, patch: bump patch version
--release@ones/cli-plugin v1.22.0+packup the .opk file for the production Environment. If not specify this, the .opk file only can be used for the developer environment

login​

Store the parameters used to obtain user credentials in a specific environment into config/local.yaml.

Argument baseURL is protocol sensitive, different protocol type will be treated as a different scope.

After login successfully, CLI will store the scope parameters into ~/.ones/cli-plugin.yaml for local debugging.

And at the same time, this command will try to run npx op pickteam local automatically if the current project has never had a team picked before.

npx op login [options] [baseURL]

Arguments​

ArgumentDescription
baseURLSpecify the environment url for login.

Options​

OptionAliasDescription
--host-url [url]-h [url]Optional, specify the host URL for local debugging. In the latest version of ONES, this does not need to be specified.
--username <username>-u <username>Username can be email or phone number.
--password <password>-p <password>Password.
--scope [url]-s [url]Use specific scope parameters login, default is current environment url, this option is mutually exclusive with -u, -p options.

About --scope option​

note

In different operating systems, the path of credential storage will be different.

  • Linux/macOS: ~/.ones/cli-plugin.yaml
  • Windows: C:\Users\YOUR_USERNAME\.ones\cli-plugin.yaml
Content like this
scopes:
https://foo.example.com:
baseURL: https://foo.example.com
username: foo
password: fooPass
https://bar.example.com:
baseURL: https://bar.example.com
username: bar
password: barPass

It should be noted that when executing the login command and using the scope option:

  • This option is mutually exclusive with -u, -p options.
  • If the selected scope credential is invalid, enter the interactive question and answer to enter the new user credential information (the effect is equivalent to executing npx op login).

Examples​

  1. Enter the interactive Q&A process and input the login parameters.
npx op login
  1. Login to https://dev.ones.com environment. And then enter the inquiry session flow input rest parameters: hostURL, username, password.
npx op login https://dev.ones.com
  1. Login to https://dev.ones.com environment and set hostURL to tcp://dev.ones.com:30002 with two parameters and not enter the interactive Q&A process.
warning

Port: if deployed in a Docker environment, the port is 9006; if deployed in a k3s/k8s environment, the port is 30002.

npx op login https://dev.ones.com -h tcp://dev.ones.com:30002 -u test@ones.com -p password
  1. Use https://dev.ones.com scope parameters to login to https://partnerdev.ones.com environment.
npx op login https://partnerdev.ones.com -h tcp://dev.ones.com:30002 -s https://dev.ones.com

pickteam​

Fetch the team list with the user credentials stored in the config file (config/local.yaml or config/ci-deploy.yaml) and update the config file with the team information from the team list for local debugging or CI deployment.

Before performing this operation, the login operation should be completed in the corresponding target.

npx op pickteam [target] [options]

Arguments​

ArgumentDescription
targetSpecify the target type configuration for which team information needs to be updated, target type only can be local or ci.

Options​

OptionAliasDescription
--branch-name <branch>-b <branch>Specify a branch name for the CI deployment configuration.
--team-uuid <uuid>Match the specified team uuid in the team list.
--team-name <name>Match the specified team name in the team list.
note

The -b --branch-name <branch> option only takes effect when the target is ci, and leave blank or not specify a value will enter the interactive Q&A for branch name selection.

note

When --team-uuid and --team-name are specified at the same time, only --team-uuid will be used.

Example​

  1. Fetch the team list with the user credentials stored in the config/local.yaml. If does not store user credentials, you need to execute npx op login first.
npx op pickteam local
  1. Display the branch list with the user credentials stored in the config/ci-deploy.yaml, and enter the interactive Q&A process for choosing the branch to fetch the team list, if does not store user credentials, you need to execute npx op ci first.
npx op pickteam ci
  1. Fetch the team list with the user credentials stored in config/ci-deploy.yaml with the branch name next, please note that the branch name is case sensitive, and the branch name must be the same as the branch name in the config/ci-deploy.yaml, the CLI will throw an error if no branch name matches.
npx op pickteam ci -b next
  1. Fetch the team list with the user credentials stored in the config/local.yaml, after fetching the team list, CLI will try to pick the team with the team UUID T7YB134K, the CLI will throw an error if no team UUID matches
npx op pickteam local --team-uuid T7YB134K
  1. Fetch the team list with the user credentials stored in config/ci-deploy.yaml with the branch name next, after fetching the team list, CLI will try to pick the team with the team name TestTeamName, the CLI will throw an error if no team name matches
npx op pickteam ci -b next --team-name TestTeamName

invoke​

Start the plugin project locally and invoke one or several life-cycles of the plugin.

The difference between process and life-cycles is that the process will contain multiple life-cycles.

npx op invoke [options] <target>

Arguments​

ArgumentDescription
targetSpecify the process or life-cycle you want to invoke.

Available life-cycle​

  • install
  • enable
  • disable
  • uninstall

Developer can learn more about available life-cycle in the guide section.

Available processes​

ProcessContain life-cycle
run
  • install
  • enable
clear
  • disable
  • uninstall

Options​

OptionAliasDescription
--mode <type>specify the mode, support mode:
  • all
  • backend
  • frontend
Default mode is all.
--webpack-stats-preset <level>Specify the webpack logging level, support level:
  • errors-only
  • errors-warnings
  • minimal
  • none
  • normal
  • verbose
  • detailed
  • summary
Default level is info.
--reinstall-pluginWhen the installed plugin appid in the target environment conflicts with the current plugin project, it will attempt to uninstall the plugin in the target environment and install the plugin content from the local project.
--self-tunnel <endpoint>The custom plugin service backend address, which must ensure that the ONES instance can access your local plugin via HTTP. If the address created by the default localtunnel open-source tool used by the CLI tool is not accessible by the ONES instance, you can choose a stable tunneling tool on your own or seek assistance from your company's network administrator.
info

In ONES versions >= v3.14.150+, >= v6.1.78, and >= v6.2.5+, it is necessary to specify self-tunnel. Generally, you do not need to deliberately use self-tunnel; only when the default provided tunnel network is unstable do you need to use self-tunnel to provide a stable network environment.

When you specify self-tunnel or use the default localtunnel address, you can use https://{tunnel-address}/healthz to check if your plugin service is functioning correctly.

upgrade​

Requirements​

@ones/cli-plugin
v1.14.0+

Overview​

Upgrade @ones/cli-plugin and relative dependencies to lastest version which range of current major version

npx op upgrade

scan​

Scan the interface URLs used in the plugin project.

npx op scan [target]

Requirements​

@ones/cli-plugin
v1.19.0+

Arguments​

ArgumentDescription
targetThe target type to scan, supported types are:

When target parameter is not provided, it will scan both api and trigger by default.

Options​

OptionAliasDescription
--output-oThe output file path for scan results. If not specified, the scan results will only be printed to the console. The scan results file is in YAML format.

Scanning and Matching Rules​

api​

The op tool scans for strings, string templates, and string concatenation expressions in the plugin source code. When a string literal contains the character /, the scanning program considers it as a URL and converts it into a regular expression consisting of pre regex fragment, URL regex fragment, placeholder regex fragment, and post regex fragment.

Additionally, for cases where the scanning tool fails to detect an API, you can manually specify the API using the @ones-api comment:

import APIs from 'apis'

import { request } from './utils'

// @ones-api: /api/project/users/me
request(APIs.getUsers())

For cases where the scanning tool erroneously detects an API, you can manually exclude the API using the @ones-api-ignore comment:

const Routes = () => {
return (
<Switch>
{/* @ones-api-ignore */}
<Route path="/login" component={Login} />
{/* @ones-api-ignore */}
<Route path="/register" component={Register} />
</Switch>
)
}

Or you can manually exclude the entire file from scanning using the @ones-api-ignore-file comment:

// @ones-api-ignore-file

const Routes = () => {
return (
<Switch>
<Route path="/login" component={Login} />
<Route path="/register" component={Register} />
</Switch>
)
}

trigger​

The op tool scans the Trigger slots in the plugin.yaml, collects the corresponding APIs, and converts them into URL regular expressions.

After the scan is complete, the op tool performs regex matching between the collected URL regular expressions and the API set in the scan configuration, and outputs the matched APIs.

Scan Configuration​

You can customize the behavior of the scan by using the scan configuration option in the op.config.mjs configuration file.

The scan configuration structure is as follows:

interface ScanConfigSchema {
roots?: string[]
exclude?: (string | RegExp)[]
apis?: string[]
output?: {
level?: 'matched' | 'all'
file?: string | undefined
}
patternFragment?: {
pre?: string
placeholder?: string
post?: string
}
checkIsPathLikeString?: (value: string) => boolean
}
Field NameField TypeDefaultDescription
rootsstring[]["web","backend"]Root directories to scan
exclude(string|RegExp)[][/node_modules/]Paths to exclude from scanning
apisstring[][]The set of APIs to match
output.level"matched"|"all""all"Output level of scan results:
  • matched: Output only the matched scan results
  • all: Output all scan results
patternFragment.prestring"(?:[^\n]*)"Pre-regex fragment of URL regular expression
patternFragment.placeholderstring"(?:[^\n/]*)"Placeholder regex fragment of URL regular expression
patternFragment.poststring"(?:[^\n]*)"Post-regex fragment of URL regular expression
checkIsPathLikeString(value: string) => boolean(value) => value.includes("/")Custom function to determine whether a string is a URL