Skip to main content

@ones-op/utils

We provide some commonly used tool library encapsulation.

Installation​

Install the package in the plugin /web directory using the following command:

npm install @ones-op/utils

Usage​

import { stringifySearchQuery } from '@ones-op/utils'
import type { SearchQueryType } from '@ones-op/utils'

const testCasePlanURL = 'https://ones.com/project/#/testcase/team/JTsTqqQo/plan'

const App = () => {
const searchQuery: SearchQueryType = {
allow: 'fullscreen',
conditions: [
{
field: 'test_plan_related_project',
operate: 'include',
value: ['SbmRCmXZ36snAhUY'],
},
],
}

const src = stringifySearchQuery(testCasePlanURL, searchQuery)

return <iframe width="1500" height="800" allow="payment" src={src}></iframe>
}

Index​

APIDescription
stringifySearchQuerySplicing URL and search parameters

APIs​

stringifySearchQuery​

Splicing URL and search parameters.

Requirements​
ONES@ones-op/bridge
v3.13.35+v0.21.1
Params​
ParamsDescriptionTypeRequiredDefault
urlTarget page urlstringY-
searchQuerySearch parametersSearchQueryTypeY-
Type​
export interface SearchQueryType {
/** filter query criteria */
conditions: {
/** filter project */
field: FieldType
/** filter operate */
operate: OperateType
/** filter value */
value: string[]
}[]
/** full screen of the page */
allow?: 'fullscreen'
}

/** filter project: currently only support 'test_plan_related_project' */
type FieldType = 'test_plan_related_project'

/** filter operate: include: equal, exclude: not equal */
type OperateType = 'include' | 'exclude'