Skip to main content

local.yaml

The plugin local debugging configuration file, the built-in op cli of the plugin project will consume the content of the file when performing the relevant instructions of the local debugging.

note

The local debugging configuration is stored in local.yaml, so changes to the local.yaml file will not be recorded and submitted by git to avoid submitting user credentials and other information to the remote end, resulting in information Security Risk.

File path and structure:

/config/local.yaml
platform:
address: tcp://172.16.1.1:30002
username: ''
password: ''
local:
id: '********'
language: nodejs
debug_mode: true
timeout_sec: 30
organization_uuid: '********'
team_uuid: '********'
web_service_port: '3000'
web_service_ip: 127.0.0.1
user_uuid: '********'
log_in_local: false
log_level: info
file_in_local: false
mysql_in_local: false
mysql_user_name: ''
mysql_user_password: ''
mysql_database_name: ''
mysql_host: ''
mysql_port: ''
instance_uuid: '********'

platform​

The Open platform configuration.

address​

  • Type: string
  • Example: tcp://172.16.1.1:30002

Open platform host service TCP address.

baseURL​

  • Type: string
  • Example: https://172.16.1.1:9000

ONES instance interface access address.

username​

  • Type: string

The email or mobile phone number used to load the user's credentials.

password​

  • Type: string

The password used to load user credentials.

local​

Local plugin configuration.

id​

  • Type: string

The HOST ID used by the plugin is randomly generated by the op cli, which is generally no need to modify it.

language​

  • Type: 'nodejs'

The language used by the plugin generally does not need to be modified.

debug_mode​

  • Type: boolean

Enable the debugging mode for HOST.

note

This will print a large number of logs. If you need to debug, we recommend that you add log printing to the plugin code for debugging.

timeout_sec​

  • Type: number
  • Unit: seconds

Maximum duration for receiving open platform messages.

organization_uuid​

  • Type: string

The ID of the organization to which the user belongs is brought back after the user logs in. Generally, no change is required.

team_uuid​

  • Type: string

The ID of the team to which the user belongs is brought back after the user logs in. Generally, no change is required.

web_service_port​

  • Type: string
  • Default: 3000

Plugin front-end local development service port.

web_service_ip​

  • Type: string
  • Example: 127.0.0.1

Plugin front-end local development service ip.

user_uuid​

  • Type: string

UUID of the organization administrator account, which is brought back after the user logs in. Generally, it does not need to be changed.

log_in_local​

  • Type: boolean
  • Deprecated

Whether logs are recorded locally.

note

Logs are recorded on both local and open platforms.

log_level​

  • Type: 'fatal' | 'error' | 'warning' | 'info' | 'debug'

Adjust console output verbosity. Default is 'info'.

file_in_local​

  • Type: boolean

The ability provided by @ones-op/node-file, is the working interval the workspace directory of local plugins.

mysql_in_local​

  • Type: boolean

@ones-op/node-database, whether the database is connected to the local MySQL.

caution

If you use a local database, you still need to fill in the following configuration:

mysql_user_name​

  • Type: string
  • Condition: enable mysql_in_local

Local database user name.

mysql_user_password​

  • Type: string
  • Condition: enable mysql_in_local

Local database user password.

mysql_database_name​

  • Type: string
  • Condition: enable mysql_in_local

Local database name.

mysql_host​

  • Type: string
  • Condition: enable mysql_in_local

Local database host.

mysql_port​

  • Type: string
  • Condition: enable mysql_in_local

Local database port.

instance_uuid​

  • Type: string

Debug the instance UUID of the plugin.

If the value is empty, the Open Platform will randomly generate a UUID and fill it back to the local.yaml, and continue to use this UUID.

note

Executing npx op invoke clear will not empty this field

After executing the npx op invoke run, the terminal display the following content:

...
Local debugging return value: {"instance_uuid":"********"}
...

You can return the plugin instance of the debugging plugin instance from the return value of the local debug command or the config/local.yaml file.

dangerously_accept_unauthorized_https​

  • Type: boolean

Whether to allow the use of unauthorized HTTPS certificates. DO NOT modify this option unless you know what you are doing.