Skip to main content

@ones-op/node-fs

We provide a set of related interfaces for file operations, allowing plug-in developers to operate on files in the plug-in file working directory.

The node-fs package is implemented by encapsulating the fs of Node.js. Currently, the node-fs package only supports the interface to promises in fs .

Requirements​

ONES
v3.14.0+

API​

APIs​

The following is a list of APIs supported by the node-fs package:

NameFunctionIllustrateSupport
accessaccess(path[, mode])Test the user's permissions on the file or directory specified by path.yes
appendFileappendFile(path, data[, options])Asynchronously appends data to the file, creating the file if it does not already exist.yes
chmodchmod(path, mode)Change the permissions of the file.yes
chownchown(path, uid, gid)Change the owner of the file.yes
copyFilecopyFile(src, dest[, mode])Copies src to dest asynchronously. By default, if dest already exists, it will be overwritten.yes
cpcp(src, dest[, options])Asynchronously copy the entire directory structure from src to dest, including subdirectories and files.yes
lchmodlchmod(path, mode)Change the permissions of a symbolic link. This method is only implemented on macOS.yes
lchownlchown(path, uid, gid)Change ownership on symlinks.yes
lutimeslutimes(path, atime, mtime)Change file access and modification times.yes
linklink(existingPath, newPath)Create a new link from existingPath to newPath.yes
lstatlstat(path[, options])Equivalent to fsPromises.stat(), except that path points to a symbolic link, in which case the link itself is counted, not the file it refers to.yes
mkdirmkdir(path[, options])Create directories asynchronously.yes
mkdtempmkdtemp(prefix[, options])Create a unique temporary directory.yes
openopen(path, flags[, mode])open a file.yes
opendiropendir(path[, options])Asynchronously opens a directory for an iterative scan.yes
readdirreaddir(path[, options])Read the contents of a directory.yes
readFilereadFile(path[, options])Read the entire contents of the file asynchronously.yes
readlinkreadlink(path[, options])Read the contents of the symbolic link referenced by path.yes
realpathrealpath(path[, options])Determine the actual location of path.yes
renamerename(oldPath, newPath)Rename oldPath to newPath.yes
rmdirrmdir(path[, options])Delete the directory identified by path.yes
rmrm(path[, options])Delete files and directories.yes
statstat(path[, options])The fs.Stats for the given path.yes
symlinksymlink(target, path[, type])Create a symbolic link.yes
truncatetruncate(path[, len])Truncate (shorten or lengthen) the content on path to len bytes.yes
unlinkunlink(path)If path points to a symbolic link, the link is removed without affecting the file or directory to which the link points. If the file path pointed to by path is not a symbolic link, delete the file.yes
utimesutimes(path, atime, mtime)Change the filesystem timestamp of the object referenced by path.yes
watchwatch(filename[, options])Returns an asynchronous iterator that monitors changes on filename, where filename is a file or directory.yes
writeFilewriteFile(file, data[, options])Asynchronously writes data to a file, replacing the file if it already exists.yes

Parameter​

1.The parameters of the API in the node-fs package are consistent with the fs of Node.js, but the following restrictions are imposed on the file and directory parameters​

(1) The directory or file parameter must be of string type. If the parameters are not satisfied, an error message will be given:

      "Argument of the file or directory is not assignable to parameter of type 'string'."



(2) Directory or file parameters are not allowed to exceed the workspace directory. If the parameters are not satisfied, an error message will be given:

      "Invalid Param: ../file21.txt Out of the accessible path range."


Example​

The use of each interface of node-fs is basically the same as the fs of Node.js.

The following is mkdir give as a simple example:

import {Logger} from '@ones-op/node-logger'
import {promises} from '@ones-op/node-fs'

const dir1_name = './dir1'
const dir2_name = './dir1/dir2'
const dir3_name = './dir1/dir2/dir3'

export async function TestMkdir() {
try {
await promises.mkdir(dir1_name)
await promises.mkdir(dir3_name, {recursive: true})

} catch (error: any) {
Logger.error('[TestMkdir] error:', error.message)
}
}