Skip to main content

ci-deploy.yaml

The plugin Continuous Integration configuration file, which contains the configuration information required for Continuous integration testing and installation of plugins. It is generated by cli tools. For more information, please see the Continuous Integration document.

File path and structure:

/config/ci-deploy.yaml
default:
host: https://ones.com
username: ci@ones.com
password: '********'
ones-check-id: '********'
ones-check-point: team
ones-plugin-id: built_in_apis
organization_uuid: '********'
team_uuid: '********'

default​

The default branch configuration, 'default' can meet most scenarios.

In order to facilitate your subsequent upgrade, we do not recommend that you add more branch configurations here, the cli will be optimized for this in version 2.0.

note

When you enter the branch parameter of the branches through the cli-related command are main or master, the merger name default will be automatically used.

host​

  • Type: string

ONES Continuous Integration environment access path.

username​

  • Type: string

ONES Continuous Integration environment login username.

password​

  • Type: string

ONES Continuous Integration environment login password.

ones-check-id​

  • Type: string

ONES Continuous Integration environment team or organization UUID.

caution

If your current plugin scope at the organization level, change this UUID to the organization UUID you want to install it to.

ones-check-point​

  • Type: 'team' | 'organization'

ONES Continuous Integration environment ones-check-id type.

caution

If your current plugin scope at the organization level, change this type to organization.

ones-plugin-id​

  • Type: 'built_in_apis'

ONES Continuous Integration environment interface request header, the fixed value build_in_apis, request to the Open Platform.

organization_uuid​

  • Type: string

The organization UUID for the ONES Continuous Integration environment.

team_uuid​

  • Type: string

The team UUID for the ONES Continuous Integration environment.