Skip to main content

OPT CLI Commands

The OPT CLI is used to perform operations such as checking OPK package in a non-plugin development environment.

Installation​

npm install -g @ones/cli-tools

After installation, you can run opt [command] [arguments] [options] to invoke the commands.

opt help # View help
opt help check # View help for the 'opt check' command

Configuration File​

When executing the opt command, the OPT-CLI will read the op.config.mjs file in the command execution directory as the configuration file.

Overview​

CommandDescription
checkCheck for incompatible ONES APIs, modules, and abilities in an OPK package

check​

Check for incompatible ONES APIs, modules, and abilities in an OPK package.

Parameters​

ParameterDescription
opksThe path to the OPK package, can be a file or a folder. Multiple paths separated by , are supported
opt check demo-plugin.opk # Check the demo-plugin.opk
opt check plugins # Check the OPKs in the 'plugins' directory (does not recursively search subdirectories, i.e., it will check plugins/demo.opk but not plugins/sub-dir/demo.opk)
opt check plugins,demo-plugin.opk # Check the OPKs in the 'plugins' directory and the demo-plugin.opk

Configuration​

The opt command will perform the check based on the following fields exported from the op.config.mjs file:

Configuration ItemField TypeDescription
onesVersionstringThe version of the ONES system to which the OPK package will be installed. opt check will check if the OPK package contains slots or abilities incompatible with this version of the ONES system
enableApiHijackbooleanWhether to allow plugins to declare API interfaces that hijack the ONES API. The default value is false.
scan.apisstring[]The collection of incompatible APIs. opt check will check if the OPK package uses any ONES APIs declared in this collection
scan.patternFragment{ pre: string; placeholder: string; post: string }The regular expression fragment used for API matching. Refer to op scan for usage details.

Options​

optionsdescriptions
--ones-versionThe version of the ONES system to which the OPK package will be installed, equivalent to the onesVersion field in the op.config.mjs configuration
--scan-apisThe collection of incompatible APIs, equivalent to the scan.apis field in the op.config.mjs configuration
--enable-api-hijackWhether to allow plugins to declare API interfaces that hijack the ONES API, equivalent to the enableApiHijack field in the op.config.mjs configuration

Example​

Suppose we want to install a plugin package demo.opk, which runs properly on ONES v3.6.0, on ONES v3.15.0. We can follow these steps:

  • Configure op.config.mjs
export default {
onesVersion: '3.15.0', // Declare the target ONES system version
scan: {
// Declare the collection of incompatible ONES APIs when upgrading from ONES v3.6.0 to ONES v3.15.0
apis: [
'/project/api/modify/issue-type/:issueTypeID',
'/project/api/users',
'/project/api/plugins/list',
'/project/api/dashboard/list',
],
},
}
  • Execute opt check demo.opk to perform the check.

The check result will be printed on the console.

info

If the OPK file is generated by an OP-CLI tool whose version lower than 1.21.0, the opt check command will skip checking ONES API.