Skip to main content

Modify script properties

Suitable EnviromentPrivate Deployment

Require​

ONES
v3.16.18+

Overview​

After we create the script attribute, we can make secondary modifications to the script attribute. Currently, the name of the script attribute can be modified.

Capability range​

Products, work items, single selection, multiple selection, floating point script attributes under the project

use​

Add the capability through the OP tool, modify the configuration related to the capability, and complete the business logic in the update script attribute method. The relevant steps are as follows.

Step 1: Add and use capabilities through OP tools​

Use the command line to enter the OP command in the plug-in root directory to add capabilities (this command requires OP tool version 1.0 and above)

npx op add ability

Check and add update-script-field@1.0.0


The OP tool will ask whether to use the default value. Just select Yes. The OP tool will add the following content to the plug-in.

Add a new file update-script-field.ts in the plugin backend

backend/src/script-field-float.ts
import type {
Relation,
UpdateFieldGroupRequest,
UpdateScriptFieldRequest,
} from '@ones-op/node-ability'
import { Field, FieldTypeEnum, PoolEnum, AbilityError } from '@ones-op/node-ability'
import { Logger } from '@ones-op/node-logger'
import type { PluginRequest, PluginResponse } from '@ones-op/node-types'

export async function updateFieldName(request: PluginRequest): Promise<PluginResponse> {
const u: UpdateScriptFieldRequest = {
Pool: PoolEnum.Product,
FieldUUID: 'fieldUUID',
TeamUUID: 'teamUUID',
Name: 'newFieldName',
}
try {
const resp = await Field.UpdateScriptField(u)
} catch (e) {
if (e instanceof AbilityError) {
Logger.error('err', e)
}
}
return {
body: {
res: 'hello world',
},
}
}

Field.UpdateScriptFieldRequest parameter introduction

ParametersTypeDescription
PoolstringThe context to which the script attribute belongs, including products, projects, and work items
FieldUUIDstringScript attribute UUID
TeamUUIDstringUUID of the team to which the attribute belongs,only takes effect when the plug-in is at the organization level
NamestringThe new name of the script property

Step 2: Just modify the logic in the function correctly​