Skip to main content

Custom Sprint Capacity

Requirements​

ONES
v6.0.10

Overview​

When you wish to use a new calculation method for estimating scale in the backlog component, this can be achieved through the CustomSprintCapacity ability.

Performance​

  1. After the plugin uses the CustomSprintCapacity ability, in the configuration of calculation method for estimated scale in the backlog component, an option added by the plugin will appear
  2. When the calculation method option is updated to the plugin's option, the estimated scale displayed on the backlog component page will show the plugin's calculation result

Usage​

Step One: Add Ability​

To add a new ability, use the command npx op add ability and select the custom-sprint-capacity@1.0.0 type. After adding this ability, a backend/src/custom-sprint-capacity.ts file will be created, and the following configuration will be added to the config file.

Example Configuration:

config/plugin.yaml
abilities:
- id: ESvlWi7E
name: 自定义预估规模
version: 1.0.0
abilityType: CustomSprintCapacity
function:
calcSprintsCapacites: calcSprintsCapacites
calcTasksCapacity: calcTasksCapacity
config:
- key: name
value: custom-sprint-capacity name
fieldType: Input
label: name
show: true
- key: desc
value: custom-sprint-capacity description
fieldType: Input
label: desc
show: true

Step Two: Configure Ability Config​

Fill in the name and desc fields, it is recommended to set the length of name within 10 characters.

Step Three: Write the Capacity Calculation Function​

The backend/src/custom-sprint-capacity.tsfile will automatically generate the calcSprintsCapacites, calcTasksCapacity functions.

  • calcSprintsCapacitesis used to calculate sprint capacity.
  • calcTasksCapacityis used to calculate the capacity of selected issue items.

Parameter Introduction​

calcSprintsCapacites

  • Input Parameters

    ParametersTypeRequiredDescription
    langstringYesUser language for i18n
    sprint_uuids[]stringYesList of sprint uuids
  • Output Parameters

    ParametersTypeRequiredDescription
    datamap[string]SprintCapacityYessprint capacity calculation result
    key: sprint uuid
    SprintCapacityTypeRequiredDescription
    valuestringYesCalculated value of sprint capacity
    unitstringNoUnit of sprint capacity calculation
  • Example

backend/src/custom-sprint-capacity.ts
export async function calcSprintsCapacites(request: PluginRequest): Promise<PluginResponse> {
const body = request?.body as any
const lang = body.lang
const sprintUUIDs = body.sprint_uuids as string[]
// 打印入参
Logger.info('lang', lang)
Logger.info('sprintUUIDs', sprintUUIDs)

// 遍历迭代id,计算每个迭代的规模
// @ts-ignore
const sprintCapacitiesMap = sprintUUIDs.reduce((acc, uuid, i) => {
acc[uuid] = {
value: (10 + i).toString(),
unit: '行',
}
return acc
}, {})
Logger.info('sprintCapacitiesMap:', sprintCapacitiesMap)

// 返回计算结果
return {
statusCode: 200,
body: {
code: 200,
body: {
data: sprintCapacitiesMap,
},
},
}
}

calcTasksCapacity

  • Input Parameters

    ParameterTypeRequiredDescription
    langstringYesUser language for i18n
    task_uuids[]stringYesList of task uuids
  • Output Parameters

    ParameterTypeRequiredDescription
    dataTaskCapacityYesIssue item size calculation result
    TaskCapacityTypeRequiredDescription
    valuestringYesCalculated value of the selected tasks
    unitstringNoCalculation unit of the selected tasks
  • Example

backend/src/custom-sprint-capacity.ts
export async function calcTasksCapacity(request: PluginRequest): Promise<PluginResponse> {
const body = request?.body as any
const lang = body.lang
const taskUUIDs = body.task_uuids as string[]
// 打印入参
Logger.info('lang', lang)
Logger.info('taskUUIDs', taskUUIDs)

// 计算taskUUIDs的工作项规模
var taskCapacity = {
value: (taskUUIDs.length * 10).toString(),
unit: '行',
}
// 返回计算结果
return {
statusCode: 200,
body: {
code: 200,
body: {
data: taskCapacity,
},
},
}
}