Skip to main content

Custom Tabs for Issue Detail Form

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES@ones-op/bridge@ones-op/store@ones-op/sdk
v6.0.43+v0.9.0+v0.5.0+v0.3.0+

Overview​

Once a plugin is configured with this ability, it can add custom tabs to any issue view's detail form. The addition, deletion, and usage of these tabs in the view are same as the system's built-in tabs. In the corresponding slot, you can access the issue context.

Ability Demonstration​

1. Add custom tabs to the detail form in the view​

After the plugin is correctly configured with ability and slots and installed, you can see the tabs declared by the plugin in the add tabs popup, as shown below:

2. View plugin tab preview in view configuration​

After adding to the tabs, you can see the preview of the tab in the view preview. If the plugin declares a Preview slot, it will display a custom preview by the plugin; otherwise, the platform will display a default plugin tab preview:

3. View plugin tab in issue details​

After the view is successfully published, you can view the custom Tab slot of the plugin in the details of the issue using the corresponding view:


Usage​

This ability needs to be associated with the ones:issue:tab:new slot, which includes two sub-slots:

  • Tab: Displayed in the issue detail form
  • Preview (Optional): Displayed in the view edit form

Step 1: Add Ability, Tab Slot​

In the following operations, we will add a ability, add a slot associated with the ability, and a sub-slot.

Execute in the command line in the following order:

# 1️⃣ Execute in the plugin root directory
$ npx op add ability

# 2️⃣ Select this ability
Please select the ability you want to add:
layout-custom-issue-tab@1.0.0

# 3️⃣ If the `ones:issue:tab:new` slot has been added before, you will see this prompt
# If not, go directly to 5️⃣
Do you want to bind existing modules of type 'ones:issue:tab:new'? (Y/n)

# 4️⃣ Enter `N` to create a new slot (enter 5️⃣), or enter `Y` to associate the slot (enter 9️⃣).

# 5️⃣ Enter the new parent slot name according to the prompt data
Please enter the module 'ones:issue:tab:new' title you want to add:
CustomIssueTab

# 6️⃣ According to the prompt, enter Y to add another **sub-slot**
continue to add a sub module:
Yes

# 7️⃣ Fill in the sub-slot name:
Please enter the sub module title:
CustomIssueTabContent

# 8️⃣ Stop the command:
continue to add a sub module:
No

✅ Success! Add ability.


---------------------------------------

# 9️⃣ If the `ones:issue:tab:new` slot has been added before and `Y` was selected in step 3️⃣, you can follow the steps below to select and associate the existing slot
Please select the module you want to binded: …
ones-issue-tab-new-CuTs

At this point, the ability and slot have been successfully added and are associated through moduleID. The plugin configuration file config/plugin.yaml will have the following added content:

...
abilities:
+ - id: pzlDRTZC
+ name: CustomIssueTab
+ version: 1.0.0
+ abilityType: LayoutCustomIssueTab
+ relateModule:
+ moduleID: ones-issue-tab-new-CuTs
...
modules:
+ - id: ones-issue-tab-new-CuTs # Parent slot, used for ability association
+ title: Plugin Custom Tab # Tab title
+ moduleType: ones:issue:tab:new
+ modules:
+ - id: ones-issue-tab-new-5JFV # Sub-slot, used for rendering detail Tab page
+ title: CustomIssueTabContent
+ enableMemoryRouter: true
+ entry: modules/ones-issue-tab-new-CuTs/ones-issue-tab-new-5JFV/index.html
...

At the same time, a slot directory web/src/modules/ones-issue-tab-new-CuTs/ones-issue-tab-new-5JFV is generated.

You can add a description field to add a description to the Tab:

...
modules:
- id: ones-issue-tab-new-CuTs
title: Plugin Custom Tab
+ description: Custom description
moduleType: ones:issue:tab:new
modules:
- id: ones-issue-tab-new-5JFV
title: CustomIssueTabContent
enableMemoryRouter: true
entry: modules/ones-issue-tab-new-CuTs/ones-issue-tab-new-5JFV/index.html
...
tip

After the above steps are completed, you still need to manually add the name: Tab field to the sub-module according to the following configuration.

The purpose is to declare that it is displayed in the Tab of the issue details.

  - id: ones-issue-tab-new-CuTs
title: Plugin Custom Tab
description: Custom description
moduleType: ones:issue:tab:new
modules:
- id: ones-issue-tab-new-5JFV
+ name: Tab
title: CustomIssueTabContent
enableMemoryRouter: true
entry: modules/ones-issue-tab-new-CuTs/ones-issue-tab-new-5JFV/index.html

Step 2: Add Preview Slot (Optional)​

If the plugin does not have a custom preview slot, the system's default preview will be used.

Execute in the plugin root directory:

npx op add sub-module

Select the id of the parent module you just added, the example in the document is ones-issue-tab-new-CuTs.

The configuration file will add the following content (a new sub-slot for ones:issue:tab:new):

  - id: ones-issue-tab-new-CuTs
title: Plugin Custom Tab
description: Custom description
moduleType: ones:issue:tab:new
modules:
- id: ones-issue-tab-new-5JFV # Used for rendering detail page Tab
name: Tab
title: CustomIssueTabContent
enableMemoryRouter: true
entry: modules/ones-issue-tab-new-CuTs/ones-issue-tab-new-5JFV/index.html
+ - id: ones-issue-tab-new-jzIG # Used for rendering view preview Tab
+ title: IssueTabPreview
+ enableMemoryRouter: true
+ entry: modules/ones-issue-tab-new-CuTs/ones-issue-tab-new-jzIG/index.html
tip

Finally, manually add the name: Preview identifier to the sub-module. Like this:

The purpose is to declare that it is displayed in the preview of the view configuration.

  - id: ones-issue-tab-new-CuTs
title: Plugin Custom Tab
description: Custom description
moduleType: ones:issue:tab:new
modules:
- id: ones-issue-tab-new-5JFV # Used for rendering detail page Tab
name: Tab
title: CustomIssueTabContent
enableMemoryRouter: true
entry: modules/ones-issue-tab-new-CuTs/ones-issue-tab-new-5JFV/index.html
- id: ones-issue-tab-new-jzIG # Used for rendering view preview Tab
+ name: Preview
title: IssueTabPreview
enableMemoryRouter: true
entry: modules/ones-issue-tab-new-CuTs/ones-issue-tab-new-jzIG/index.html

Step 3: Get Issue Context in Slot​

Make sure the plugin web directory has added the @ones-op/sdk dependency.
npm install @ones-op/sdk

1. Get in Tab Slot​

Open the slot entrance file generated in the previous step web/src/modules/ones-issue-tab-new-CuTs/ones-issue-tab-new-5JFV/index.tsx

In the React component of the slot, use useProps('ones:issue:tab:new', 'Tab') to get the issue context, and the returned data structure is as follows:

interface TabProps {
issueUUID: string
projectUUID: string
viewMode: 'wide' | 'narrow'
}

Complete slot code example:

import type { FunctionComponent } from 'react'
import React from 'react'
import ReactDOM from 'react-dom'
import { ConfigProvider } from '@ones-design/core'
import { OPProvider } from '@ones-op/bridge'
import { useProps } from '@ones-op/sdk'

export interface HomeProps {
className?: string
}

export const Home: FunctionComponent<HomeProps> = () => {
// Get issue context
const props = useProps('ones:issue:tab:new', 'Tab')

return (
// Traverse and display the data in props
<div>
Issue Context:
{Object.entries(props).map(([key, value]) => (
<div key={key}>
{key}: {value}
</div>
))}
</div>
)
}

ReactDOM.render(
<ConfigProvider>
<OPProvider>
<Home />
</OPProvider>
</ConfigProvider>,
document.getElementById('ones-mf-root')
)

2. Get in Preview Slot​

useProps('ones:issue:tab:new', 'Preview')

Since the preview is unrelated to the specific issue, the return value only includes the layout mode:

interface PreviewProps {
viewMode: 'wide' | 'narrow'
}

Ability Behavior in Different Lifecycle Stages​

  1. Plugin Enabled
  • All issue views, including global and local ones, can add "Plugin Custom Tab".
  • "Plugin Custom Tab" that has been configured to the views will be displayed again after re-enabling.
  1. Plugin Disabled
  • "Plugin Custom Tab" cannot be added to all issue views.
  • "Plugin Custom Tab" that has been configured to the views will no longer be displayed.
  • The draft of a view that has "Plugin Custom Tab" configured is invalid and cannot be edited, but you can cancel the publication and re-enter.
  1. Plugin Uninstalled
  • "Plugin Custom Tab" cannot be added to all issue views.
  • The previously configured "Plugin Custom Tab" will be deleted and cannot be retrieved by reinstalling the plugin. You need to reconfigure it.
  • The draft of a view that has "Plugin Custom Tab" configured is invalid and cannot be edited, but you can cancel the publication and re-enter.

FAQ​

Can multiple custom tabs be added? How many can be added at most?

Yes, you can repeat the add steps to add multiple tabs. One plugin can declare up to 10 tabs, and the system can have up to 10 tabs at the same time.