Skip to main content

Selection

Suitable EnviromentPrivate Deployment

Requirements​

ONES@ones-op/node-ability
v3.6.0+v0.3.7+

Overview​

This capability allows plugins to add script fields with the type single-select/multi-select menus. The options for these properties can be dynamically specified by the plugin code. Additionally, this capability supports aggregating multiple script properties that have associated relationships into a property group, enabling interactive effects among multiple script properties.

Scope​

Single-select/multi-select menu script fields can be added as issue fields, project fields, and product fields.The script properties of issue and project are supported for use in Performance.

Performace​

Issue​

When single-select/multi-select menu script fields are added as issues fields, you can add them to specific issue types, just like using system issue fields.

In most scenarios, script issue fields behave similarly to the system issue fields in the ONES system. However, there are slight differences in the following scenarios:

  • In layout configuration, tagged fields do not support script fields.
  • In issue list view,only filtering based on script issue fields is supported, while sorting and grouping based on script issue fields are not supported.
  • Importing issues does not support importing issues that contain script issue fields.
  • In "Automation Settings", updating script issue fields and creating issues with pre-set script field values are not supported.
  • In "My Work" - "Dashboard" - "Custom Report Card", using script issue fields as analysis dimensions is not supported.

Project​

When single-select/multi-select menu script fields are added as projects script fields, you can add them to specific projects just like using system project fields.

In most scenarios, script project fields behave similarly to the system project fields in the ONES system. However, there are slight differences in the following scenarios:

  • In project list view, only filtering based on script issue fields is supported, while sorting and grouping based on script issue fields are not supported.
  • In "My Work" - "Dashboard" - "Project List Card", script field

Product​

In most scenarios, script product fields behave similarly to the system product fields in the ONES system. However, there are slight differences in the following scenarios:

  • In product list view, only filtering based on script issue fields is supported, while sorting and grouping based on script issue fields are not supported.

Usage​

Create script field​

Using the Field module from @ones-op/node-ability, you can create script fields at the appropriate timing, such as in the Install hook function of the plugin.

caution

Currently, this capability only supports team-level plug-ins.

Issue​

You can use the Field.FieldsAdd method to create issue script field.

backend/src/index.ts
import { Field } from '@ones-op/node-ability'

export async function Install() {
Logger.info('[Plugin] Install')
const FieldsAddRes = await Field.FieldsAdd({
Name: 'singleSelect field',
Type: 1001, // multiSelect: 1002
})
if (FieldsAddRes.Error) {
throw new Error('Failed to create property')
}
const { UUID: fieldUUID } = FieldsAddRes
Logger.info('create field:', fieldUUID)
}

Field.FieldsAdd Parameter Description

ParameterTypeDescription
NamestringProperty name
TypeintScript field type:
- 1001: single-select
- 1002: multi-select

Project/Product​

You can use the Field.ItemsAdd method to create project/product script fields.

backend/src/index.ts
import { Field, FieldTypeEnum, PoolEnum } from '@ones-op/node-ability'
import { Logger } from '@ones-op/node-logger'

export async function Install() {
Logger.info('[Plugin] Install')
const ItemsAddProjectRes = await Field.ItemsAdd({
FieldType: FieldTypeEnum.SingleLabel,
Name: 'Single Select Project Field',
ItemType: 'field',
Pool: PoolEnum.Project,
ContextType: 'team',
required: false,
})
if (ItemsAddProjectRes.Error) {
throw new Error('Failed to create field')
}
const { UUID: fieldUUID } = ItemsAddProjectRes
Logger.info('Created field:', fieldUUID)
}

Field.ItemsAdd Parameter Description

ParameterTypeDescription
FieldTypestringScript property type:
- FieldTypeEnum.SingleLabel: Single select
- FieldTypeEnum.MultiLabel: Multi-select
NamestringProperty name
ItemTypestringFixed value: field
PoolstringEntity type:
- PoolEnum.Project: Project property
- PoolEnum.Product: Product property
ContextTypestringContext type
requiredboolWhether the property is required

Field options​

To customize the options for a script field, you need to add an interface /scriptFieldSearch in the plugin configuration file. The ONES system internally uses this interface to fetch the options for the script field.

config/plugin.yaml
service:
app_id: ...
name: ability-scriptSelection
...
apis:
- type: addition
methods:
- POST
url: /scriptFieldSearch
function: GetOptions

In the GetOptions method, you need to construct and return the options for the script field.

backend/src/index.ts
interface Body {
field_uuid: string
uuids?: Array<string> // Only used for field group
relations?: Array<{
// Only used for field group
field_uuid: string
field_value: string[]
}>
context?: {
project_uuid?: string;
issue_type_uuid?: string;
task_uuid?: string;
}
}

interface optionType {
uuid: string
value: string
}

interface Response {
body: {
code: number
body: {
options: Array<{
optionType
}>
}
}
}

export async function GetOptions(request: PluginRequest<Body>): Promise<Response> {
const body = request?.body
const options.optionType = [] // Options data to be returned

for (let i = 0; i < 3; i++) {
options.push({
uuid: 'optionsUUID' + i.toString(),
value: 'Option Value' + i.toString(),
})
}

return {
body: {
code: 200,
body: {
options,
},
},
}
}

Once you have completed the above steps, you can use the created script field in the ONES system.

The GetOptions function takes a body parameter with the following properties:

Property NameTypeRequiredDefault ValueDescription
field_uuidstringYesN/AField UUID
uuidsarrayNo[]List of option UUIDs
relationsarrayNo[]List of related fields
keywordsstringNoN/ASearch keyword
paginationobjectNoN/APagination information, include size and page
UserUUIDstringYesN/AUser UUID
contextobjectNoN/AContext of the field

The relations parameter is an array of objects with the following properties:

Property NameTypeRequiredDefault ValueDescription
field_uuidstringYesN/ARelated field UUID
field_valuearrayNonullRelated field value
field_indexnumberNoN/ARelated field position

The context parameter is an object with the following properties:

Property NameTypeRequiredDefault ValueDescription
project_uuidstringNoN/AProject UUID
issue_type_uuidstringNoN/AIssue type UUID
task_uuidstringNoN/ATask UUID

The current page's context, such as the project uuid, issue type uuid, and the task uuid, can be used to narrow down the search scope for task and other entities.

Field group​

Sometimes, there can be certain relationships between multiple script fields, such as "Province" and "City." The options for "City" may vary based on the selected value of "Province." Additionally, when a particular "City" is selected, the corresponding "Province" should also be automatically selected. To achieve this kind of relationship, we can aggregate these script fields into an field group.

Create field group​

You can use the Field.AddGroupField method to add a field group.

const relations = fieldUUIDS.map((fieldUUID, index) => ({
FieldUUID: fieldUUID,
FieldParentUUID: '',
Position: index,
}))

const AddGroupFieldRes = await Field.AddGroupField({
Name: 'Field Group Name',
ObjectType: PoolEnum.Task,
Relations: relations,
})

Field.AddGroupField Parameter Description

ParameterTypeDescription
ObjectTypestringThe entity type of the field group. Possible values:
- PoolEnum.Project: Project
- PoolEnum.Product: Product
- PoolEnum.Task: Issue
NamestringThe name of the field group
RelationsIRelationMessageAn array of relationship information

IRelationMessage

ParameterTypeDescription
FieldUUIDstringThe fieldUUID of the field
FieldParentUUIDstringThe UUID of the parent field, indicating hierarchy
PositionstringThe position of the field within the group

Field Options​

For the fields within the field group, we also utilize the /scriptFieldSearch interface to retrieve the options for each field. However, the construction of field options varies depending on the request parameters:

  • If the request parameters include uuids: the uuids field contains the IDs of the selected options for the field. In this case, the corresponding options for these IDs should be returned.
  • If the request parameters include relations: the relations field contains the values of the related fields. Consequently, the field options should be filtered and returned based on the values of the related fields.
  • If the request parameters neither include relations nor uuids: all field options should be returned.
interface Body {
field_uuid: string
uuids?: Array<string> // contains the IDs of the selected options for the field
relations?: Array<{
// contains the values of the related fields
field_uuid: string
field_value: string[] | null
}>
}

interface Response {
body: {
code: number
body: {
options: Array<{
uuid: string
value: string
}>
}
}
}

const locations = {
Guangdong: ['Guangzhou', 'Shenzhen'],
Jiangsu: ['Nanjing', 'Suzhou'],
}

const buildOptions = (options) => {
return {
body: {
code: 200,
body: {
options,
},
},
}
}

export async function GetOptions(request: PluginRequest<Body>): Promise<Response> {
const body = request.body || {}
const { field_uuid, uuids, relations } = body
if (field_uuid === 'City') {
const allCitys = Object.values(locations).flat()
if (uuids) {
/**
* If uuids are provided in the request parameters, the corresponding options for the IDs included in uuids should be returned directly.
*/
return buildOptions(
uuids.map((uuid) => {
return {
uuid,
value: uuid, // In the example, for simplicity, the UUIDs and values are assumed to be the same.
}
})
)
}
if (relations) {
/**
* If `relations` are provided in the request parameters,
* the available cities should be filtered based on the associated property, which is the value of the province.
* Only the cities corresponding to the selected province should be returned.
**/
const province = relations.find((relation) => relation.field_uuid === 'Province')
?.field_value[0]
if (province) {
return buildOptions(
locations[province].map((city) => {
return {
uuid: city,
value: city,
}
})
)
}
}
/**
* If neither `uuids` nor `relations` are included in the request parameters, all cities should be returned.
*/
const allCitys = Object.values(locations).flat()
return buildOptions(
allCitys.map((city) => {
return {
uuid: city,
value: city,
}
})
)
}
}

Field value linkage​

For field group fields, plugin developers need to implement a /groupFieldOnChange interface:

config/plugin.yaml
apis:
- type: addition
methods:
- POST
url: /groupFieldOnChange
function: GroupFieldOnChange

When a field in the field group is about to be modified, the ONES system will send a request to the plugin. This request includes the current values of all properties in the field group and the ID of the property being changed. In the processing function of this request, developers can use the value of the changed field to set the values of other related fields within the field group. Finally, all values of the fields in the field group should be returned together.

For example, when the value of the "City" field changed, we want to set the value of the "Province" field accordingly, we can implement it as follows:

interface Body {
group_uuid: string // ID of the field group
change_field_uuid: string // ID of the changed field
field_values: Array<{
// Values of all fields in the field group
field_uuid: string // ID of the field
option_uuids: Array<string> | null // IDs of the field values
}>
UserUUID: string // ID of the current user
}

interface Response {
statusCode: number
body: {
code: number
body: {
field_values: Array<{
field_uuid: string
option_uuids: Array<string> | null
}>
}
}
}

const locations = {
Guangdong: ['Guangzhou', 'Shenzhen'],
Jiangsu: ['Nanjing', 'Suzhou'],
}

const buildResult = (field_values) => {
return {
statusCode: 200,
body: {
code: 200,
body: {
field_values,
},
},
}
}

export async function GroupFieldOnChange(request: PluginRequest<Body>): Promise<Response> {
const { change_field_uuid, field_values = [] } = request.body || {}
if (change_field_uuid === 'City') {
const city = field_values.find((field_value) => field_value.field_uuid === 'City')
?.option_uuids[0]
for (const province in locations) {
if (locations[province].includes(city)) {
return buildResult([
{
field_uuid: 'Province',
option_uuids: [province],
},
{
field_uuid: 'City',
option_uuids: [city],
},
])
}
}
}
}

Field value validation​

To complete the functionality of the field group, developers need to implement a /groupFieldValidate interface.

config/plugin.yaml
apis:
- type: addition
methods:
- POST
url: /groupFieldValidate
function: GroupFieldValidate

When a user submits a modification to the field group, the ONES system internally sends a request to this interface. The request parameters include the current values of all fields in the field group. In the processing function of this interface, developers can perform validation on the values of the field group. The success or failure of the validation depends on whether the status code is 200. If the validation fails, the modification is considered invalid. When the validation is successful, an additional update of the field values can be performed.

interface Body {
UserUUID: string
field_groups: Array<{
group_uuid: string
field_values: Array<{
field_uuid: string
option_uuids: Array<string>
}>
}>
}

interface Response {
statusCode: number
body: {
code: number
body: {
options: Array<{
field_uuid: string
option_uuid: string
option_value: string
}>
}
}
}

export async function GroupFieldValidate(request: PluginRequest<Body>): Response {
const { field_groups = [] } = request.body
const options = []
field_groups.forEach(({ field_values }) => {
field_values.forEach(({ field_uuid, option_uuids }) => {
option_uuids.forEach((option_uuid) => {
options.push({
field_uuid,
option_uuid,
option_value: option_uuid,
})
})
})
})
const isValid = checkIsValid(options)
return {
statusCode: isValid ? 200 : 500,
body: {
code: isValid ? 200 : 500,
body: {
options,
},
},
}
}

Updating Field Values​

For single-select/multi-select menu script fields, each field option has a unique uuid. The value of a field represents the uuid of the selected option. You can use Field.UpdateFieldOption to modify the value of the option, thus updating its display on the interface.

const UpdateFieldOptionRes = await Field.UpdateFieldOption([
{
TeamUUID: globalThis.onesEnv.teamUUID,
FieldUUID: fieldUUID,
UUID: 'valueUUID',
Value: 'value',
ObjectType: 3,
},
])

Field.UpdateFieldOption Parameters

ParameterTypeDescription
TeamUUIDstringTeam UUID
FieldUUIDstringScript field UUID
UUIDstringUUID of the field option
ValuestringValue of the field option
ObjectTypeintEntity type, can have the following values:
- 1: Product
- 2: Project
- 3: Task

Sequence Diagram​

After adding script fields and field groups, the complete process of modifying fields is as follows:

ONES
v3.16.18+

Modify attribute group​

After creating an attribute group, you can make secondary modifications to the attribute group, including the name of the attribute group and the attribute cascade relationship within the attribute group. When modifying the name in the attribute group, there will be the following changes on the system side:

  1. If an attribute group belongs to a work item and is configured to the corresponding work item view, it includes the local view of the work item under the configuration center, the work item view under the configuration center, and the work item view under the project. For local views, if there are new attributes after modifying the view, the new attributes will be added to the attribute configurations of these views, but deleting attributes will not remove the attributes from these views. It is possible that some views may be added successfully, but some views may not be added successfully. If some views fail to be added, the successful view attribute configuration will not be rolled back at this time, but the attribute group will only be rolled back to the original configuration.
  2. If an attribute group belongs to a project and is configured to the corresponding project attribute configuration, if there are new attributes after modifying the view, the new attributes will be added to the attribute configuration of these projects, but deleted. Properties will not remove properties from these views. There may be situations where some project configurations are added successfully and some project configurations fail to be added. At this time, the successful project property configurations will not be rolled back, only the properties will be added. The group is rolled back to the original configuration.
  3. Because the product attribute configuration is global, there is no operation to complete the attribute configuration.
  4. At the same time, there can only be one task for modifying the same attribute group.
Add this capability through the op tool​

Use the command line to enter the OP command in the plug-in root directory to add capabilities (this command requires OP tool version 1.0 and above)

npx op add ability

Check and add update-field-group@1.0.0

import type {
Relation,
UpdateFieldGroupRequest,
UpdateScriptFieldRequest,
} from '@ones-op/node-ability'
import { Field, PoolEnum, AbilityError } from '@ones-op/node-ability'
import { Logger } from '@ones-op/node-logger'
import type { PluginRequest, PluginResponse } from '@ones-op/node-types'

export async function UpdateTaskFieldGroup(request: PluginRequest): Promise<PluginResponse> {
const { uuid1, uuid2, groupUUID } = request.body as any
const relations: Relation[] = [
{
FieldUUID: uuid1,
FieldParentUUID: '',
Position: 0,
},
{
FieldUUID: uuid2,
FieldParentUUID: '',
Position: 1,
},
]
//Modify attribute group
try {
const req: UpdateFieldGroupRequest = {
Name: 'newFieldGroupName',
Relations: relations,
ObjectType: PoolEnum.Task,
GroupUUID: groupUUID,
}
const res = await Field.UpdateFieldGroup(req)
const { jobUUID, status } = res
} catch (e) {
if (e instanceof AbilityError) {
Logger.error('err', e)
}
}
return {
body: {
res: 'hello world',
requestBody: {},
},
}
}

Field.Relation parameter introduction

ParametersTypeDescription
FieldUUIDstringScript property fieldUUID
FieldParentUUIDstringScript attribute parent node fieldUUID
PositionintOrder in property configuration

Field.UpdateFieldGroupRequest parameter introduction

ParametersTypeDescription
TeamUUIDstringTeamuuid,only takes effect when the plug-in is at the organization level
Relations[]RelationNew association
ObjectTypePoolEnumThe type to which the property group belongs
GroupUUIDstringModified attribute group UUID
NamestringAttribute group name

Updated results parameter introduction

ParametersTypeDescription
jobUUIDstringWhen the attribute group needs to complete the attribute configuration operation, an asynchronous task will be generated to complete the event, which can be queried by jobID
statusstringUpdate result. When it is "success", it means the update has been successful. When it is "waiting", it means that a task with complete attribute configuration is generated. You can query the result by querying the asynchronous task sdk

Query and update attribute group results​

After updating the attribute group, if the corresponding jobID is returned, you can query whether the job has been completed by calling the query sdk.

Add this capability through the op tool​

Use the command line to enter the OP command in the plug-in root directory to add capabilities (this command requires OP tool version 1.0 and above)

npx op add ability

Check and add check-job-status@1.0.0

import type {
Relation,
UpdateFieldGroupRequest,
UpdateScriptFieldRequest,
} from '@ones-op/node-ability'
import { Job, FieldTypeEnum, PoolEnum, AbilityError } from '@ones-op/node-ability'
import { Logger } from '@ones-op/node-logger'
import type { PluginRequest, PluginResponse } from '@ones-op/node-types'

export async function checkJobStatus(request: PluginRequest): Promise<PluginResponse> {
const status = await Job.CheckJobStatus('jobUUID', 'teamUUID')
return {
body: {
res: 'hello world',
requestBody: resp,
},
}
}

Request result parameter introduction

ParametersTypeDescription
jobUUIDstringWhen the attribute group needs to complete the attribute configuration operation, an asynchronous task will be generated to complete the event. At this time, a jobID will be returned to represent the task
teamUUIDstringUUID of the team to which the job belongs,only takes effect when the plug-in is at the organization level

Query results parameter introduction

ParametersTypeDescription
statusstringTask status, there are three states: "success", "waiting", and "fail", which represent success, incomplete, and failure respectively
tip

In the ONES system, the interaction between modifying attributes in an attribute group is slightly different from modifying ordinary attributes. Since attributes in an attribute group are related, modifying attributes in an attribute group must modify the entire group:

  • When modifying the attributes in the attribute group, the attribute group editing pop-up window will pop up:

  • When modifying work item attributes in batches, if an attribute in the attribute group is selected, other attributes in the attribute group will also be automatically selected:

tip

In ONES system, modifying fields within a field group has a slightly different interaction compared to modifying regular fields. Due to the interdependency among fields within a field group, modifying fields within a field group requires modifying the entire group as a whole.

  • When modifying fields within a field group, an field group editing dialog will appear.

  • When batch modifying issue fields, if a field within a field group is selected, other fields within the same group will also be automatically selected.