Skip to main content

Scene: Automatically count the number of relationships of a certain link type of issue

Scene description​

Users want to automatically count the number of issue related to the "link" of a issue and display it in the form of issue filed.

The following figure shows that the issue has two link contents, and what the user needs is the number of the link type Link.

Performance​

Through the way of script filed, the number of issue whose link relationship is "Link" is automatically counted and displayed.

Solution​

Implementation idea​

Use Plugin Script fields - Floating point number ability.In the script filed calculation method, the uuid of a issue requests ONES to obtain the number of issue link relationship with its "Link". The assembly script filed calculation method returns parameters and returns, and you can enable the plugin to add the script filed to the issue.

Plugin development​

  1. Use OP tool to add ability Plugin Script fields - Floating point number.

  2. Modify the configuration related to script filed in the plugin configuration file plugin.yaml.

config/plugin.yaml
service: ...
apis: ...
modules: []
abilities:
- name: scriptField
version: 1.0.0
abilityType: ScriptFieldFloat
function:
calcFieldValue: linkTime
config:
- key: FieldName
value: LinkTaskNumber
fieldType: Input
show: false
id: ...
  1. In the script filed method linkTime, use graphQL to query the number of "Link" issue in batches.
caution

In the case of batch uuid, we try to use graqhQL only once, otherwise a large number of network requests will be generated.

import { fetchONES } from '@ones-op/node-fetch'
import type { PluginRequest, PluginResponse } from '@ones-op/node-types'

export const linkTime = async (request: PluginRequest): Promise<PluginResponse> => {
const body = request?.body as any
const returnValue: any[] = []
if (body.fieldUUID && body.taskUUIDs && body.taskUUIDs.length > 0) {
const uuidArray: any = []
for (const taskUUID of body.taskUUIDs) {
uuidArray.push(taskUUID)
}
const jsonUuidArray = JSON.stringify(uuidArray)
const tempAbility = await fetchONES({
path: `/team/${globalThis.onesEnv.teamUUID}/items/graphql`,
method: 'POST',
body: {
query:
'{\n tasks(\n filter: { \n uuid_in: ' +
jsonUuidArray +
',\n }\n ){ \n uuid\n name\n linkTypeIduuid0001In{\n uuid\n name\n }\n }\n}',
variables: {},
},
root: true,
})
//@ts-ignore
const linkData = tempAbility?.body?.data.tasks
for (let i = 0; i < linkData.length; i++) {
returnValue.push({
taskUUID: linkData[i]['uuid'].toString(),
value: linkData[i]['linkTypeIduuid0001In'].length * 100000, //The specific returned value can be counted according to the business logic.
})
}
}
return {
body: {
code: 200,
body: {
values: returnValue,
},
},
}
}
  1. After the plugin is developed, the plugin can be installed to create the script filed LinkTaskNumber, which can be used by adding the script filed to issue type.