Intercept issue field modifications

Suitable EnviromentSaaS
Private Deployment

Requirements​

ONES
v3.7.54+

Overview​

When you want to do some processing and validation when issue field change, you can use the TaskEventHandle ability to achieve the requirement. This ability can pre-process, verify and post-proces the event when the system generates a issue update event. When the plugin that uses this ability is installed, the issue update event will be pre-process by the plugin before processing, and the plugin can ignore, reject, and modify this event according to requirements; after the event processing is completed, The plugin will receive a notification, and some post-process can be done at this time.

Applicable scene

  1. A certain field or state of a issue has restrictions when changing, for example, it is not allowed to change the title of a issue of a requirement type.
  2. Post operations are performed after issue field changes are complete. For example, after updating the person in charge of the issue of the requirement type, send an email to the corresponding person.

Scope of application​

  • Covered

    Including changes in issue field, script-field, and status;

    Including the UI operation and the events generated by directly calling the interface;

  • Not covered

    Operations that do not directly change attributes/states, such as commenting and uploading files, are not included;

    Changes in calculated field such as number of stops, intervals, etc. are not included;

    Changes triggered by post-actions are not included;

    Does not include the processing of man-hour (man-hour are a separate item type, and the corresponding similar abilitiy will be added in the follow-up ability);

    Does not include state changes triggered by functions that modify state abnormally;

Trigger​

  • Issue details page for field or status modification
  • Modify field field in batches
  • Batch change issue type

Performance​

Using the issue processor ability configuration does not allow modification of the person in charge of the requirement, and an error is reported when modifying the person in charge of the requirement

Usage​

When ONES enables the plugin that uses the TaskEventHandle ability, the execution flow of issue field and state change events is shown in the following figure:

Step 1: Add configuration​

Use npx op add ability to add task-event-handler ability. After adding, the backend/src/task-event-handler.ts file will be added, and the following configurations will be added to the configuration file.

tip

Developers only need to pay attention to two configurations of issue type and issue field. Multiple configurations of issue type and issue field are supported. Between multiple configurations Delimited by "," .

Example configuration: Indicates issue type that focus on requirement and defect , issue field that focus on Due date and assign change event.

config/plugin.yaml
abilities:
- id: _ZcH89U9
name: TaskEventHandler
version: 1.0.0
abilityType: TaskEventHandler
function:
taskPreActionFunc: taskPreAction
taskActionDoneFunc: taskActionDone
config:
- key: issueTypeScope
value: 'Requirement,Bug'
fieldType: Input
label: IssueType
show: true
- key: field
value: 'Assignee,Due date,'
fieldType: Input
label: IssueField
show: true

Step 2: Add pre-processing​

The backend/src/task-event-handler.ts file will automatically generate the taskPreAction function, which is a pre-processing function. This function will be called before the event takes effect, and different strategies will be adopted according to the returned content。

  • Return

    The structure of the content returned by the taskPreAction function is as follows, and different strategies are adopted according to the values of the is_follow, is_reject and task_events fields:

    • Ignore: Set the returned is_follow = false, indicating that the plugin does not do additional processing, and the update event is executed according to the normal process.
    • Reject: Set the returned is_follow = true && is_reject = true, which means that the update event will not be executed and will end directly.
    • Accept: Set the returned is_follow = true && is_reject = false, which means accepting the event, but not modifying the update content, and only notifying the plugin after the event is completed.
    • Modification: Set the returned is_follow = true && is_reject = false and add field modification by returning the task_events object to indicate acceptance of this event, modify the update content this time and notify the plugin after the event is completed.
caution

Even if there is no need to add new modifications in the plugin logic, the data in the original task_events field needs to be returned, otherwise the change event may fail

type taskPreResponse = {
statusCode: number
body: {
code: number
body: {
is_follow: boolean
is_reject: boolean
reject_reason: string
task_events: any
other_data: string
}
}
}
ParamTypeRequiredDescription
is_followstringYExpress concern
is_rejectstringYWhether to refuse
reject_reasonstringNReject reason
task_events[]TaskEventYChanged data (plugins can add changed field values)
other_datainterfaceNOther data (this data will be passed to the taskActionDone method)
  • Params

    Include the following content in the request body of the function input parameter:

    ParamTypeRequiredDescription
    user_uuidstringYUser's uuid
    langstringYCurrent user language
    task_events[]TaskEventYChanged data

    TaskEvent​

    ParamTypeRequiredDescription
    task_fields[]TaskEventFieldYChange field list
    task_uuidstringYThe uuid of the issue
    actionstringYupdate: general field
    transit: status change (with step field)
    change_issue_type: issue type change
    publish_version: version release
    add : create a new issue
    issue_type_scope_uuidstringYIssue type UUID under the project to which it belongs
    issue_type_scope_namestringYThe name of the issue type under the project
    issue_type_scope_name_mapmap[string]stringYThe name of issue_type_scope in each language version

    TaskEventField​

    ParamTypeRequiredDescription
    field_uuidstringNThe uuid of the field
    field_typestringNField type
    field_namestringNThe key for the field name
    field_name_mapmap[string]stringNThe name of each language version of the field, such as:
    en: 'Assignee/Owner'
    origin: '{{field.assign}}'
    zh: '负责人'
    field_value_typestringNField value type:
    0 - any
    1 - int
    2 - string
    3 - []string
    valueinterfaceNField value
  • Example

    After modifying the field or state of a issue, the title of the issue will be modified synchronously.

    backend/src/task-event-handler.ts
    export async function taskPreAction(request: PluginRequest): Promise<PluginResponse> {
    const body = request?.body as any
    const userUUID = body.user_uuid
    const lang = body.lang
    const events = body.task_events
    const action = events[0].action
    Logger.info('nEvents', events)
    Logger.info('userID:', userUUID)
    Logger.info('lang', lang)
    Logger.info('action', action)
    // Add field modification
    const aField = {
    field_name: 'Title',
    value: 'test title',
    }
    events[0].task_fields.push(aField)
    return {
    statusCode: 200,
    body: {
    code: 200,
    body: {
    is_follow: true,
    is_reject: false,
    reject_reason: '',
    task_events: events,
    other_data: 'other data',
    },
    },
    }
    }
  • Special note:If you want the page to pop a custom warning toast,you can set it in the following ways

backend/src/task-event-handler.ts
export async function taskPreAction(request: PluginRequest): Promise<PluginResponse> {
return {
body: {
code: 400,
reason: 'Test warning error',
type: 'warning',
model: 'plugin.xxx',
},
}
}

Step 3: Add post-processing​

The taskActionDone function is automatically generated in the backend/src/task-event-handler.ts file. This function is post-processing and will be called first after the event takes effect.

  • Params

    ParamTypeRequiredDescription
    user_uuidstringYUser uuid
    langstringYCurrent user language
    task_events[]TaskEventYChanged data
    other_datainterfaceNOther data (this data will come from the taskPreAction method)
  • Example

    backend/src/task-event-handler.ts
    export async function taskActionDone(request: PluginRequest): Promise<PluginResponse> {
    var body = request?.body as any
    var events = body.task_events
    var otherData = body.other_data
    var userUUID = body.user_uuid
    var lang = body.lang
    var action = events[0].action
    Logger.info('ans event', events)
    Logger.info('ans other_data', otherData)
    Logger.info('ans userID:', userUUID)
    Logger.info('ans lang', lang)
    Logger.info('ans action', action)

    return {
    statusCode: 200,
    body: {
    code: 200,
    },
    }
    }

NOTICE​

  1. When TaskEvent.action is transit, publish_version, the plugin is not allowed to modify the state.
  2. The processing logic of taskPreAction is earlier than the required verification of the step field. If the plugin changes the value of the required item of the step field to an empty value, an error will be reported.
  3. When TaskEvent.action is change_issue_type, the plugin is not allowed to modify the issue type and parent issue.
  4. TaskEvent does not support the deletion of a field change.